3-3
LIFTING
When moving the machine, we strongly suggest you choose any one of the methods described below
to move your machine.
1.
Use a crane
(Only applies to the machine with the design of the
hanging point.)
Move the machine to its location by using a crane and a wire rope sling that can fully withstand the
weight of the machine (refer to machine specification under Section 2
General Information
).
Machine hanging with a crane should be done strictly according to the hanging points
designated by the original manufacturer. If there is any doubt on missing hanging points on your
machine, please consult with the original manufacturer or its qualified agent before hanging the
machine.
Machine lifting is likely to damage the machine
if not performed properly.
You must have a qualified crane operator
to perform the job.
You must use tools and equipment with the
proper tensile strength and use proper method
when moving your machine.
Apply the wire rope sling to the lifting hooks on
the four ends of the machine.
Refer to
Illustration: Lifting Points
for exact locations.
Slowly lift the machine. Be sure to protect the
machine from impact or shock during this
procedure. Also watch out your own fingers
and feet to avoid injuries.
Keep the machine well balanced during lifting
process and make sure the wire rope does not
interfere with the saw frame.
Summary of Contents for SH-510LDMM
Page 2: ......
Page 4: ......
Page 10: ......
Page 16: ...1 6 Illustration Emergency Stop Emergency Stop Button ...
Page 18: ...1 8 Illustration Safety Labels ...
Page 20: ......
Page 24: ...2 4 FLOOR PLAN Machine top view ...
Page 25: ...2 5 Machine front view ...
Page 26: ...2 6 Machine side view ...
Page 55: ...5 1 Section 5 ELECTRICAL SYSTEM ELECTRICAL CIRCUIT DIAGRAMS ...
Page 56: ...5 2 ...
Page 57: ...5 3 ...
Page 58: ...5 4 ...
Page 59: ...5 5 ...
Page 60: ...5 6 ...
Page 61: ...6 1 Section 6 HYDRAULIC SYSTEM HYDRAULIC DIAGRAMS ...
Page 62: ...6 2 ...
Page 84: ......
Page 86: ......
Page 87: ......