8 COMMISSIONING /
FUNCTION TEST /
DECOMMISSIONING
1.
Connect the pump group to the installation by using the pipes. The installation to the piping
must be carried out without any tension.
2.
Connect the pump.
3.
Carry out a pressure test and check all thread connections.
4.
Mount the EPP element (2) in the insulating back shell (1).
5.
Mount the lower insulation element (3) of the pump group.
6.
Mount the actuator (4), see page 7.
7.
Run the cables of the actuator, of the pump and of the temperature sensor
in the cable channel of the insulating back shell (1). The temperature sensor is situated
in the flow ball valve.
8.
Mount the upper insulation element (5) of the pump group and the thermometer
handles (6). Push the insulating back shell (1) slightly backward.
9.
Mount the insulating front shell (7).
10. Set the automatic operation mode and the desired flow temperature at the actuator.
Please observe the separate instructions regarding the actuator.