Cee® Apogee™ Developer Manual
Page
11
of
15
3.3. Environment
The Apogee
™
Developer should be operated in a clean, low humidity environment.
3.4. Unpacking/Inspection
Thoroughly check machine for shipping damage. If physical damage is seen,
DO NOT APPLY
POWER!
Contact Cee
™
immediately.
The following items should be included with the shipment.
(1) Apogee
™
Spin Developer
(1) Temperature and Humidity Sensor
(1) Power Cord with female power connector
(1) User & Installation Manual
– CD or USB
Optionally included items:
Spin Chucks with Screws
Dispense Controllers
Dispense Valves
Dispense Nozzles
Dispense Hubs
3.5. System Installation and Setup
1.
Lift the unit out of the packing crate by grasping the bottom only.
Do not
lift the by any of
the top covers or protrusions.
Do not
roll or turn the unit on its side or ends.
2.
Remove plastic wrap and packing foam.
3.
Place Cee™ Apogee™ Developer on a table of proper height and strength so that the
controls and
spin chuck are at the proper
ergonomic height.
4.
Level the machine using the feet so that the spin chuck is level front-to-back and side-to-
side.
5.
Thoroughly clean the spin bowl and spin chuck.
6.
Connect utilities to the reference diagram in Section 3.7.2
(1)
Connect the temperature/humidity sensor to the CAN terminal (#9).
(2)
Connect the vacuum supply to the vacuum fitting (#7)
(3)
Connect the drain to the drain port (#11)
(4)
Connect the exhaust lines to the exhaust port (#5)
(5)
Connect the optional dispense box is equipped to the dispense triggers (#8)
7.
Connect any dispense as indicated on the separate dispense diagrams.
8.
Plug in the machine.
9.
Once plugged in, only the cooling fan should be powered, not the display.