background image

A0470118revG.doc ©Copyright 

Cotterman

® 

Co. 2007 

2 OF3 

 

STEP 3 

INSERT NOTCHED BUSHING INTO EACH END OF REAR HANDRAIL BARS  (F).  POSITION BAR 
BETWEEN MOUNTING HOLES ON TOP OF SIDE HANDRAILS USING (4) ¼-20 x 2 ¾” HEX HEAD CAP 
SCREWS 

(DRAWING A, FIGURE 5).

 

 

YOU MAY NOW TIGHTEN ALL HANDRAIL BOLTS. 

 

STEP 4 

LAY STAIRWAY UNIT ON ITS SIDE.  BE SURE TO PLACE STAIRWAY ON A PROTECTIVE SURFACE, 
SO THE FINISH DOES NOT GET DAMAGED

 (SEE DRAWING C). 

 

STEP 5 – RUBBER BUMPER 

USING (3) 3/8-16 x 1” HEX HEAD CAP SCREWS & 3/8 WASHERS. BOLT RUBBER BUMPERS TO FRONT 
LEG ASSEMBLY (A) 

(SEE DRAWING B).

 

 
 

STEP 6 – FRAME ASSEMBLY 
NOTE: BACK PANEL (C) HAS BOTH ROUND AND SLOTTED HOLES, THE ROUND HOLES ARE AT 
THE BOTTOM & THE SLOTTED HOLES ARE AT THE TOP.

  USING (6) 3/8-16 x 1” HEX HEAD CAP 

SCREWS & LOCKNUTS, BOLT THE TOP OF BACK PANEL (C) TO THE TOP PLATFORM BRACKET 

(SEE 

DRAWING C).

  BOLT THE BOTTOM OF BACK PANEL (C) TO BASE PANEL (E) ON THE INSIDE OF 

LUGS (1) 

(SEE DRAWING C).

   BOLT BASE PANEL (E) TO FRONT LEG LUGS (3) 

(SEE DRAWING C). 

 

NOTE: DO NOT TIGHTEN THESE BOLTS AT THIS TIME 

 
STEP 7 

USING (2) 3/8-16 x 1 ¼” HEX HEAD CAP SCREWS & LOCKNUTS, BOLT DIAGONAL BRACE (K) TO THE 
OUTSIDE OF LUGS (2) ON BASE PANEL (E) AND INSIDE OF LUGS (4) ON STAIRWAY UNIT (D) 

(SEE 

DRAWING C). 

 

NOTE: DO NOT TIGHTEN THESE BOLTS AT THIS TIME 

 

STEP 8 

USING (4) 3/8-16 x 1” HEX HEAD CAP SCREWS & LOCKNUTS, BOLT HORIZONTAL BRACE (I) TO THE 
OUTSIDE OF LUGS (4) ON STAIRWAY UNIT (D) AND OUTSIDE OF LUGS (5) ON BACK PANEL (C).  
BOLT VERTICAL BRACE (J) TO THE OUTSIDE OF LUGS (6) ON BASE PANEL (E) AND INSIDE OF LUGS 
(4) ON STAIRWAY UNIT (D) 

(SEE DRAWING C). 

 

NOTE: DO NOT TIGHTEN THESE BOLTS AT THIS TIME 

 

Reviews: