-7-
CLEARANCES TO COMBUSTIBLES
It is of utmost importance that the clearances to combustible materials be strictly adhered to during installation of the stove. Refer to the
tables below :
• Floor to ceiling height must be at least 7’ (2.13m) in all cases.
• Do not place any combustible material within 4’ (1.2m) of the front of the unit.
• The clearance between the flue pipe and a wall are valid only for vertical walls and for vertical flue pipe.
• The chimney connector must not pass through an attic or roof space, closet or similar concealed space, a floor, or a ceiling.
• For Canadian installations, where passage through a wall, or partition of combustible construction is desired, the installation must
conform to CAN/CSA-B365.
• A flue pipe crossing a combustible wall must have a minimum clearance of 18” (457.2mm).
• To reduce clearances from combustible materials, contact your local safety department.
Single Wall Pipe
Model A
B
C
D
E
F
3000
14
(358mm)
20
(508mm)
17.5
(445mm)
30.5
(775mm)
11
(279mm)
24
(610mm)