18
INSTALLATION
PREPARATION
INSTALLATION MANUAL
INSTALLATION
PREPARATION
To ensure the safe use of the Covana cover, it must
be installed on a properly prepared surface. It is
important to adequately prepare the foundation and
carefully read the following recommendations.
Location considerations
Ensure the future Covana cover location is not
subjected to any downpour of water or debris
falling from another rooftop.
Ensure that the base of the cover is not in a
flood zone. Any damage caused by flooding or
water accumulation will not be covered under
the warranty.
Ensure that there are no obstacles, such as
branches or electrical power lines, in the
operating range of the cover.
Refer to section
Technical specifications
for
dimensions of cover.
Ensure there is safe access to the tub, free of
obstacles or debris.
All the base components of the Covana cover
must be supported by the foundation.
Do not concentrate or directly reflect sunlight
onto the cover. This could cause permanent
damage (e.g. reflection from a window).
Ensure the Covana cover is installed on a
clean surface free of any vegetation, such as
grass,
branches,
roots
or
mineral
contaminants, such as rocks, dust or sand.
The key switch must be permanently mounted
and located 5 ft. (1.5 m) away from the hot tub
and 5 ft. (1.5 m) above the deck or ground
level. Be sure that the user has a clear view of
the Horizon cover when operating it.
Furthermore, the key switch terminal should
be located in a place where no water
downpour or debris could fall on it. (Figure 28)
WARNING
Failure to permanently install the key switch as
indicated could cause serious injury or even
death and void the warranty and certification.
Only the proper installation of the key switch
combined with the suggested procedures and
caution will reduce such risks.
Do not place the cover in an area prone to
snow accumulation or water runoff.
DANGER
Failure to properly install the key switch
according to these instructions could result in
injury or even death.
1.5 metres
1.5
met
res
5 feet
5 f
ee
t
Hot tub
Figure 28
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...