20
INSTALLATION PREPARATION
INSTALLATION MANUAL
Installation reference information
Throughout the following installation instructions, we
will refer to the front, rear, left and right sides of the
cover. Please refer to Figure 30 and Figure 31. The
front of the cover is the side with the higher point of
the tilt and the back of the cover
is the operator’s side.
REAR
of
the cover
FRONT
of
the cover
Figure 31
Operator unit
LEFT
of
the cover
RIGHT
of
the cover
Figure 30
Operator unit
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...