22
INSTALLATION
INSTALLATION MANUAL
6) Remove the seal, the foam spacers and the
optional parts box, either the tub mounting or the
ground anchoring hardware, from the bottom of
the crate and place them in a safe place. (Figure
33)
7) Carefully cut the tie wrap holding the long U-
frame to the stud, remove the motor-side from the
crate and place it in a safe place. (Figure 33)
8) Unscrew the two #8-10 x 1½ in. Robertson
screws on the operator base plate, remove the
operator from the crate and place it in a safe
place. (Figure 34)
9) Remove both U-frames at the bottom of the crate
and place them in a safe place. (Figure 35)
10) Unscrew the bottom #8-10 x 1½ in. Robertson
screws holding the posts assemblies to the crate.
There are two bottom screws per post as shown
in Figure 35.
CAUTION
•
Be careful while handling any painted
components to avoid any scratches on the
surface.
Figure 34
#8-10 x 1½ in.
Robertson screws
Figure 33
Motor-side
Seal
Tie-wrap
Figure 35
#8-10 x 1½ in. Robertson screws
U-frames
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...