32
INSTALLATION
INSTALLATION MANUAL
Post assembly
1)
Insert the pivot arm on the tube on top of the first
post assembly. For hot tubs 36 in. (91.4 cm) high
or less, place the pivot arm flat side facing down.
For hot tubs above 36 in. (91.4 cm) high, place
the pivot arm flat side facind up. (Figure 69)
2)
Install the 5/16 X 1 1/4in. shoulder screw through
the pivot arm and the pivot tube to lock them
together. (Figure 70)
3)
Put the 1in. diameter black cap in the pivot arm
to prevent dirt from getting into the mechanism.
(Figure 70)
CAUTION
•
Improper installation reduces the lifespan of
the mechanical lifting components.
4)
Repeat steps 1 to 3 for the second post
assembly.
5)
Place the two post assemblies at the required
position next to the hot tub and vertically align the
holes in the pivot arms with those on the sides of
the C-channels. (Figure 71) Both openings for
the drive shafts at the bottom of the posts should
be pointing toward the rear side of the cover.
(Figure 68)
Note:
There may be a difference in height
between the pivot arms and the cover frame. It
will be adjusted at a later step. Only the vertical
alignment is important at this point.
CAUTION
•
The posts are heavy, be careful while handling
them.
Pivot
tube
Opening
pointing the
rear side
Figure 68
Pivot
arm
Hot tubs 36 in.
(91.4 cm) or
less
Hot tubs 36 in.
(91,4 cm) or
more
Flat side
(facing down)
Flat side
(facing up)
Figure 69
Pivot
tube
Lock
nut
5/16 x 1 1/4in.
shoulder screw
1in. Diameter
black cap
Pivot arm
Figure 70
Figure 71
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...