Lifting mechanism assembly
1)
Insert the square drive-shaft over the square
shaft on the bottom of the jack through the
opening in the bottom of the post and push it as
far as possible. (Figure 72)
2)
Slide a short U-frame over the first square drive-
shaft and push it in as deep as possible into the
opening at the bottom of the post. (Figure 72)
Note:
The U-frame end that has one hole must
go toward the post assembly and the end that
has 2 holes must go toward the rear of the cover.
(Figure 73)
CAUTION
•
Be sure the U-frame is fully inserted into the
post so the length sticking out is 25 in. (63.5
cm).
•
Be sure the U-
frame’s extrusion is well
inserted in the footplate insert as shown in the
detailed view of Figure 75.
•
Be careful not to damage the paint on the U-
frame or the outer sleeve while inserting the
U-frame into the post.
3) Secure it in place by putting a 5/16-18-2 hex cap
screw through the hole, put a5/16-18 nylon nut
from the other side and 5/16 nylon washers on
both sides. (Figure 74).
WARNING
Be sure the U-frame is properly locked in
place by the 5/16-18 x 2 in. hex cap screw, as
shown in Figure 75, by pulling it.
CAUTION
•
Do not overtighten the screws or use any
power tools as it could break the U-frame or
the hardware itself.
4) Repeat step 1 to 3 for the second post.
5/16-18 x 2 in.
hex cap screw
5/16-18
nylon nut
5/16 nylon
washers
Short
U-frame
One-hole
side
Figure 73
Figure 74
Figure 75
Figure 72
Drive
shaft
Rear
side
Short
U-frame
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...