INSTALLATION MANUAL
INSTALLATION
37
23) Use the threaded rod screws (Figure 81) on both
posts to
align the pivot arms’ screw slots with the
screw on the cover. Raise the post by turning the
threaded rod screw counter clockwise and lower
the post by turning the threaded rod screw
clockwise.
CAUTION
The maximum height that can be obtained
with the threaded rod is 23 in. (58.4 cm).
DO
NOT
unscrew the threaded rod more than this
height. Failure to follow this instruction will
damage the post assemblies (Figure 84).
24) Screw the two front 1/4-20 x 1 in. button head
screws and 1/4 in. flat washers on both sides of
the cover and pivot arms as shown in Figure 85.
25) Tighten the two back 1/4-20 x 1 in. screws on
both sides of the cover. (Figure 84)
26) Fasten the top plates at the top of each post
assembly using the two #8-1/2 in. painted
screws. (Figure 86)
27) For both post assemblies, slide the all-weather
seals down. Ensure they are properly resting on
the outer sleeves’ top. Push down on the seal
as shown. (Figure 87)
Note:
The black seal flap of the all-weather seal
should be facing downwards when pushing
down.
WARNING
Improper installation of the all-weather
seal could impede performance and
reduce the lifespan of the mechanical
lifting components.
Improper installation of the all-weather
seal could cause damage to the lifting
mechanism.
Can go from
approx. 9 in.
(22.8 cm) to 23
in. (58.4 cm).
¼-20 x 1 in. back screws.
(DO NOT REMOVE)
Figure 84
1/4 flat
washer
1/4-20 x 1 in.
button head
screw
Figure 85
Top plate
#8-1/2 in.
painted screw
Figure 86
Figure 87
Push down where red
arrows indicate
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...