INSTALLATION MANUAL
INSTALLATION
39
5)
Tighten all the bolts and ensure the tub mount
supports are lying flat on the surface of the tub.
WARNING
Do not overtighten any hardware. Failure to
follow this instruction could damage the paint
or the hardware itself.
Ensure the arms’ angle is as minimal as
possible. Failure to follow this instruction will
cause permanent damage to the hot tub.
6)
Screw the tub mount supports to the tub using
the four appropriate size screws per tub mount
support. (Figure 91)
WARNING
Make sure the screws for the tub mount
supports are installed on a solid portion of the
tub’s frame.
7)
Repeat steps 1 to 6 for the other post.
8)
Insert the four outer sleeve gaskets in the cut
outs (two on each side) to prevent dirt or water
from getting into the sleeve. (Figure 93) Repeat
for other post assembly.
9)
Once the Horizon cover is properly mounted to
the hot tub, anchor both U-
frame’s corner
brackets to the ground using at least 1/4x2 in.
screws. (Figure 94)
WARNING
The minimum anchoring screw size is 1/4x2
in. Failure to follow this instruction could cause
damage to some components or serious
injuries.
#10-12 x 3/4 in.
Phillips screws
1 anchor point on
the U-
frame’s
corner bracket
Figure 91
Figure 93
Figure 92
Figure 94
Outer sleeve
gasket
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...