INSTALLATION MANUAL
59
INSTALLATION CHECKLIST
(
Installer copy
)
To ensure proper installation you must carefully read this checklist and verify that you have completed every step
of the installation. The customer must receive a completed copy of this checklist.
(Please check each box when verified)
□
The base preparation steps have been done correctly.
(Location and foundation preparation sections)
□
The installation steps have been done correctly.
(Uncrating, cover assembly, lifting mechanism and ground anchoring
or tub mount assembly section)
□
The seal is properly installed and there is no steam leaking out around the cover.
(Seal application section)
□
The wiper brackets are properly installed to ensure the cover is watertight.
(Wiper brackets installation section)
□
The key switch is
permanently mounted
and located 5 ft. (1.5 m) away from the hot tub and 5 ft. (1.5 m) above
the deck or ground level
.
□
The electrical portion of the installation was done by a certified electrician.
(Electrical hook-up, limit switch adjustment
sections)
□
All the parts that came with the Covana cover have been installed.
□
The start-up procedure was completed.
(The key sequence responds correctly)
The all-weather seal functions properly.
(Lay flat against the outer sleeves while fully closed)
Serial number:
__________________________________________
Signature of installer: ___________________________________________
Name of installer:
____________________________________________
Signature of customer: ____________________________________________
Name of customer:
____________________________________________
Date (YYYY/MM/DD): ____________________________________________
Dealer’s name:
____________________________________________
Owner’s address:
___________________________________________
Summary of Contents for C-HOR
Page 1: ...Revision 13 2018 04 23...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 APPENDIX...
Page 54: ...54 APPENDIX INSTALLATION MANUAL Wiring diagram North America 60 Hz 120 VAC Operator...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 Wiring diagram Europe 50 Hz 220 VAC Operator...