MR Series 600K
User Manual
36
Figure3-9 Bottom size of MR 600K (unit: mm)
Step 3 Install expansion bolts. The structure and installation for the expansion bolt is as shown in Figure3-
10.
Figure3-10 Expansion bolt structure and installation
Take whole expansion tube into the hole as standard of expansion bolt installation depth. Expansion
tube should not higher than ground, which is to avoid effect the following cabinet installation.
The outer height of expansion bolts should be within the range of 30-50mm.
Step 4 Move the UPS from wooden bracket to the ground, and align the bottom installation hole at the
expansion bolt, lock the bolts.
Summary of Contents for MR Series
Page 1: ...Uninterruptible power supply COVER MR 600 kVA User manual ...
Page 2: ......
Page 10: ......
Page 36: ......
Page 38: ...MR Series 600K User Manual 28 3 2 Installation Preparation 3 2 1 Installation Tools Tools ...
Page 56: ......
Page 60: ...MR Series 600K User Manual 58 Figure4 4 Fault protection with no output Figure4 5 Shutdown ...
Page 61: ...MR Series 600K User Manual 59 Figure4 6 Exit parallel system Figure4 7 Bypass output ...
Page 62: ...MR Series 600K User Manual 60 Figure4 8 Battery INV output Figure4 9 Mains INV output ...
Page 89: ...MR Series 600K User Manual 87 Figure4 57 Confirm to power off ...