7

 

4.

 

Example of Connection

 

 

 
If cables between inverter and chopper resp. chopper and brake resistor are less than 25 cm, they have 
to be twisted and if they are longer than 25 cm they have to be shielded 

5.

 

Dimensions

 

 

Type 

B1 

H1 

BC 2.2 

100 

48,5 

170 

158 

243 

BC 3.2 

130 

64,5 

210 

198 

208 

BC 4.2 

131 

64,5 

298 

280 

318 

 

Summary of Contents for BC 2.2 Series

Page 1: ...Brake Chopper BC 2 2 4 2 Instruction and Operation Manual...

Page 2: ...done by qualified personnel The precautions and warnings below must be observed at the operation of the chopper The braking chopper instruction and operation manual do not replace the manual of initia...

Page 3: ...nditions 4 2 2 Technical Data Chopper voltage 1000V 4 3 Connections and Indications 5 3 1 Design 5 3 2 Connectiondiagramm 6 4 Example of Connection 7 5 Dimensions 7 6 Options 8 6 1 Overcurrent relay 8...

Page 4: ...class F without condensation 5 85 relative humidity Environment Base standard DIN EN 60068 2 6 Resonance seach Test specification 5 Hz 13 2 Hz 150 Hz 2mm peak to peak 0 7g Installation height h H 100...

Page 5: ...r BUSS connection BUSS voltage inverter R1 R2 a bimetal relay must be connected in series to the braking resistor This has to be adjusted to the nominal current of the brake resistor see Chapter 4 Exa...

Page 6: ...6 Instruction and Operation Manual Misprints and technical changes reserved 3 2 Connectiondiagramm...

Page 7: ...n If cables between inverter and chopper resp chopper and brake resistor are less than 25 cm they have to be twisted and if they are longer than 25 cm they have to be shielded 5 Dimensions Type B B1 H...

Page 8: ...racket for Overcurrent relay Art No 36770 Z2 6 2 Ultrafast semiconductor fuses Use with Braking chopper Fuse value in A A Part No Fuse Art No Fuse Breaker 3pol 12262 0F 50 34606 00 34529 00 12262 1F 6...

Page 9: ...MS brake load PMAX BRAKE in kW peak load brake chopper tBRAKE in seconds brake time tRUN in seconds motoring operation tBRAKE in seconds regen operation tOFF in seconds stop Calculation Brake Resistor...

Page 10: ...10 Instruction and Operation Manual Misprints and technical changes reserved 8 Connection Diagramm option Master Slave...

Reviews: