background image

Installation 

Alio™ Note Card Reader 

 

10 

Published by CPI 

44060-IG-01-01-EN_CPI_Alio Note Card Reader_Installation Guide_V1.0_.docx 

 

16

 

Mount card reader through the back of the vendor door, and secure using 
the four hex nuts on the vendor’s mounting posts.

 

17

 

Secure green ground cable to a mounting post. 

 

Fig. 10: Mounting card reader through vendor door 

3.4.3

 

Mounting connection hub and connecting other vendor peripherals 
18

 

Mount the card reader’s connection hub magnetically inside the 

machine so that its center button and LED ring is accessible for operation 

and service. 

19

 

Connect all other vendor peripherals to the connection hub as labelled and route all connections using zip ties and snips for cable management if 
necessary.

 

20

 

Restore power to the vending machine and follow your company’s procedure for activating a telemeter. 

Alio Note card reader will connect to the cellular network. 

3.5

 

After installation 

The Alio Note card reader is fully configured for operation from the factory and once mechanically installed onto a Talos or Series 2000 note 
validator and powered. The card reader is ready to accept cards for transactions. 

Detailed information of connection status can be viewed by pressing the red “

X

” button on the card reader display 5 times. The display will 

reconfigure to indicate the status. 

 

 

16

 

17

 

Summary of Contents for Alio Note

Page 1: ...250659086 R2 Installation Guide Alio Note Card Reader...

Page 2: ...ting the device only use its original packaging It is only in this way sufficiently protected Changes or modifications to this unit not expressly approved by the party responsible for compliance could...

Page 3: ...1 Symbols 5 2 2 Additional useful technical documentation 5 3 Installation 6 3 1 Parts included 6 3 2 Tools required 6 3 3 Card reader identifier 6 3 4 Installing the Alio Note card reader 7 3 4 1 Re...

Page 4: ...1 01 EN_CPI_Alio Note Card Reader_Installation Guide_V1 0_ docx 1 Version history Rev Change Chapters Concerned Editor Date v1 0 First version all D Sanders K Roese Nov 18 2021 Document Data Part Numb...

Page 5: ...ghout this installation guide to call attention to safety messages and important information related to the card reader Caution indicates a hazardous situation which if not avoided could result in min...

Page 6: ...X cable part no 215637033C Mounting plate part no 250038091 Hardware bag 4 machine thread fixing screws part no 203716001C 1 thread forming fixing screw part no 204306001C 3 2 Tools required Nut drive...

Page 7: ...escribed in this guide may only be carried out by qualified technicians or CPI trained and authorized personnel Risk of damage to the card reader The card reader control board is fitted with component...

Page 8: ...he existing bezel is connected to the control board 9 Unscrew four bezel screws and remove the bezel and its mounting plate 3 4 2 Installingthe Alio Note card reader 10 Use two of four identical fixin...

Page 9: ...der to note validator Fig 9 Reattaching note validator s control board cover 15 Reattach the control board cover The Series 2000 control board cover is not attached with a screw When installing onto a...

Page 10: ...and service 19 Connect all other vendor peripherals to the connection hub as labelled and route all connections using zip ties and snips for cable management if necessary 20 Restore power to the vendi...

Page 11: ...must show proof of purchase when submitting equipment for service during the warranty period Owner will assume all freight charges for shipment of equipment to an authorized service center while unde...

Page 12: ...CONTACT US Crane Payment Innovations Corporate HQ 3222 Phoenixville Pike Suite 200 Malvern PA 19355 USA support cranepi com CPI support...

Reviews: