QUINTA ACE 30 AND 45 – MULTI-BOILER
INSTALLATION ON A COMBINED HEADER
It is recommended you consult a flue specialist for the design, manufacture and installation of the flue system.
For conventional or open-flue systems, on a typical multi-boiler installation with the flue combined into a single header and riser.
INSTALLATION
ON A COMBINED
HEADER
80mm boiler
connections
Tapered cone
c/w bird guard
For illustration purposes only (we recommend
installation of condensate collectors with drainage
system and water sealed siphon to the spigot
of each boiler).
Summary of Contents for Quinta Ace 115
Page 1: ...QUINTA ACE RANGE ...
Page 70: ......