MULTI
BOILER
INSTALLATION
51
PLUME
KITS
QUINTA ACE 55, 65, 90 AND 115 –
MULTI-BOILER
INSTALLATION ON A COMBINED HEADER
It is recommended you consult a flue specialist for the design, manufacture and installation of the flue system.
For conventional or open-flue systems in a typical multi-boiler installation with the flue combined into a single header and riser.
100mm boiler
connections
Tapered cone
c/w bird guard
For illustration purposes only (we recommend installation of condensate collectors with drainage system and water sealed siphon to the spigot of each boiler).
Note: Using 90° boiler connections into the header may result in larger headers and risers being required.
Summary of Contents for Quinta Ace 115
Page 1: ...QUINTA ACE RANGE ...
Page 70: ......