background image

Summary of Contents for 351.184440

Page 1: ... Model No 351 184440 CAUTION Read and follow all Safety Rules and Operating Instructions before First Use of this Product Sears Roebuck and Co Hoffman Estates IL 60179 U S A Safety Operation Maintenance Parts List Espa5ol 6700 0_ Draft 11 02 99 ...

Page 2: ...teners only DESCRIPTION The Craftsman Roofing Nailer drives full size full head roofing nails from to 1 long Magazine holds 120 nails in a coil so that one load will nail down one full bundle of shingles Tool can be used for new or reroofing with either asphalt or fiber glass shingles Safety feature disables tool unless contact trip is pressed against workpiece The contact trip is hardened to redu...

Page 3: ...ted for length of nail Figure 2 Holder Height Adjustment Unwrap coil so that second nail can be placed between sides of feed jaw Fig 5 No 63 on nailer body Slide nail heads into slot above feed jaw see Figure 3 Carefully close maga zine cover Close door securely making sure that magazine cover is held in place by tab in door I I__ Nail Head Must Be Positioned In Large Slot At Top Of Nail Feed Rack...

Page 4: ... daily with quality air tool oil If no air line lubri cator is used place five to six drops of oil into air inlet cap Fig 5 No 33 of tool everyday MAGAZINE AND PISTON RAM Keep magazine feed mechanism and contact trip area clean and free of any dirt lint or abrasive particles The tip of the ram Fig 5 No 18 can become dented or rounded over time o Square off the tip of the ram with a clean fine hand...

Page 5: ...ve O rings 1 Check air supply 2 Replace damaged or worn O rings Fig 5 Nos 11 and 13 3 Replace damaged spring Fig 5 No 12 4 Clean and lubricate cap and head valve Fig 5 Nos 7 and 14 5 Place five or six drops of air tool oil into inlet cap Fig 5 No 33 1 Check and replace damaged spring Fig 5 No 12 2 Replace damaged or worn O rings Fig 5 No 11 and 13 3 Check and replace trigger assembly 4 Clean and l...

Page 6: ...Model 351 1 84440 Figure 5 Replacement Parts Illustration for Roofing Nailer 17 _ _ 53 18_ _ 43 _ 46 38 69 56 76 85 6 ...

Page 7: ... Galvanized Roofing Nails 120 dia x 11 4 18364 A Galvanized Roofing Nails 120 dia x 1 18366 KEY PART NO NO 49 6728 00 50 5369 00 51 6729 00 52 6730 00 53 6731 00 54 6349 00 55 6732 00 56 6125 00 57 6733 00 58 6734 00 59 6735 00 60 6736 00 61 6737 00 62 6131 00 63 6738 00 64 6739 00 65 6740 00 66 6741 00 67 6742 00 68 6743 00 69 6744 00 70 6745 00 71 7537 00 72 6746 00 73 6747 00 74 6748 00 75 6749...

Page 8: ...mAs Jam_s apunte la herramienta hacia usted u otras personas o JamAs transporte la herramienta mientras presiona el gatillo Como suministro de aire para la herramienta no se deben utilizar oxfgeno gases combustibles o gases comprimidos a alta presi6n o Utilice siempre la herramienta a una distancia segura de las otras personas que se encuentren dentro de la zona de trabajo o No intente disparar el...

Page 9: ...l estanque del com presor cuando est desconectado del acoplamiento macho Si est conectado al lado de la herramienta del abastecimiento de aire el acoplamiento hembra puede sellar una carga de aire Filtro Regulador Lubricador Desconexi6n R pida Hembra Figura 1 Linea de Suministro de Aire Lazo de Manguera _ de 0 6 m iDesconexidn Rfipida Macho comprimido en la herramienta que se puede descargar en el...

Page 10: ...n cualquier direcci6n movimiento de 360 completo Vuelva a colocar el desviador Fig 5 No 2 agarr4ndolo firmemente y rot4ndolo a la posici6n deseada 10 Gire el Desviador Figura 4 Ajuste del Desviador de Escape Refi ase a la Figura 5 p4gina 6 LUBRICACION Lubrique la herramienta diariamente con aceite para herramienta de aire de calidad Si no se usa un lubricador de Ifnea de aire coloque cinco o seis ...

Page 11: ...priete los pernos Fig 5 No 3 2 Revise y cambie el anillo O o empaquetadura daSado a Fig 5 No 9 1 Revise y cambie la empaquetadura de la cara daSada Fig 5 No 47 2 Revise y cambie el amortiguador dafiado Fig 5 No 25 3 Apriete los pernos Fig 5 No 50 1 Verifique el suministro de aire 2 Cambie los anillos O daRados o desgastados Fig 5 Nos 11 y 13 3 Cambie el resorte dafiado Fig 5 12 4 Limpie y lubrique...

Page 12: ... 533 6937 For the repair or replacement parts you need Call 6 a m 11 p m CST 7 days a week PartsDirect 1 800 366 PART 1 800 366 7278 www sears com partsdirect Para ordenar piezas con entrega a domicilio 1 800 659 7084 For the location of a Sears Service Center in your area Call 24 hours a day 7 days a week 1 800 488 1222 To purchase or inquire about a Sears Maintenance Agreement Call 7 a m 5 p m C...

Reviews: