7
J.V. MANUFACTURING, INC
SC-02, SC-T1 and SC-T2 SPECIFICATIONS
General Equipment Specifications
SC-02
SC-T1
SC-T2
Wastec Charge Box Rating
1.31 cu/yd
.73 cu/yd
1.52 cu/yd
Clear Top Opening
34”x58”
31”x46”
41”x58”
Cycle Time (sec)
37
28
42
System Pressure (psi)
Normal
2,000
2,000
2,000
Maximum
2,400
2,400
2,400
Compaction Force (lbs)
Normal
39,300
44,200
42,600
Maximum
47,100
53,000
51,100
Ram Face Pressure (psi)
Normal
22.6
40
24.5
Maximum
27.1
48
29.5
Ram Penetration
5.5”
6”
8”
Motor (hp)
10
10
10
Motor (voltage)
208/230/480 3ph
208/230/480 3ph
208/230/480 3ph
Pump (capacity) (gpm)
10.5
10.5
10.5
Reservoir capacity (gal)
22
22
22
Cylinder
Bore
5”
4” (2)
4” (2)
Stroke
40”
26”
34”
Rod
2.5”
2”
2”
Construction
Floor
1/2” steel plate
1/2” steel plate
1/2” steel plate
4” “C” Channel
4” “C” Channel
4” “C” Channel
Sides
3/16” steel plate
3/16” steel plate
3/16” steel plate
2”x6”x3/16” steel tube
6” “C” Channel
4” “C” Channel
4” “C” Channel
Breaker Bar
6”x6”x3/4” steel angle
6”x6”x1” steel angle
6”x6”x1” steel angle
Ram
Top
3/16” steel plate
3/16” steel plate
3/16” steel plate
Sides
1/4” steel plate
3/16” steel plate
1/4” steel plate
Bottom
1/2” AR steel plate
1/2” AR steel plate
1/2” AR steel plate
Face
3/8” wedge face steel
1/2” steel plate
1/2” steel plate
Guides
UHMW pads
UHMW pads
UHMW pads
Summary of Contents for SCR-02
Page 2: ...2 ...
Page 4: ...4 ...
Page 8: ...8 ...
Page 9: ...9 Operation Section ...
Page 10: ...10 SAFETY DECALS ...
Page 11: ...11 SAFETY DECAL PLACEMENT ...
Page 19: ...19 Authorized Technician Maintenance Section ...
Page 24: ...24 Authorized Technician Maintenance cont Electrical Schematic ...
Page 25: ...25 Authorized Technician Maintenance cont Hydraulic Schematic ...
Page 26: ...26 Authorized Technician Maintenance cont Hydraulic Schematic ...
Page 28: ...28 Parts Section ...
Page 29: ...29 SAFETY DECAL PLACEMENT ...
Page 30: ...30 Installation Section ...
Page 33: ...33 Hauler Section ...