11
STEP 4A.
Connecting “Pump Control Leads” - SGVF or SGVH
(Direct Burial Cable to Control Panel)
STEPS & TIPS:
• Check for nicks or damage to wire prior to installation.
• Ensure wire is secure into terminal strip by pulling on wire after installation.
• Place a strip of green electrical tape on the ground wire.
FIGURE 7