17
STEP 8C.
Junction Box Wiring for OGV & SGPC Pumps
with “UltraSWITCH or FloatTREE”
STEPS & TIPS:
• Identify Which of The Following Style Junction Boxes is
Used in your Package and Wire Per Illustrations Shown.
• Inspect Wires for nicks or Defects Before Installing into
the Junction Box.
• Lubrication May Be Needed to Help Install Wires
Through the Grommets.
• Secure Wire Connections with Appropriate Size Wire
Nut. Check That Connection is Secure by pulling
on Wires After Installed.
• Place a Strip of Green Electrical Tape on The Ground
Wire.
• Cable Jacket Should be Slightly Inside of Junction Box.
FIGURE 13