STEPS & TIPS:
Keep pump cord and level control up
out of the way.
Lower pump assembly into basin
with lifting ropes, aligning discharge
plumbing as shown. Apply lubricant to
O-Ring on discharge pipe.
Be sure both discharge piping
assemblies are fully engaged.
Next lower level control into basin
with lifting rope aligning level control
as shown.
Hang coil, tie cords and ropes from
existing hooks in tank. Use zip ties
provided as needed. After unit and level
control is lowered, the valve handle will
slide over piping assembly as shown.
FIGURE 6