SECTION B: GENERAL INFORMATION
B-1) To the Purchaser:
Congratulations! You are the owner of one of the finest
pumps on the market today. Barnes
®
Pumps are products
engineered and manufactured of high quality components.
Over one hundred years of pump building experience along
with a continuing quality assurance program combine to
produce a pump which will stand up to the toughest
applications.
This Barnes Pumps, Inc. manual will provide helpful
information concerning installation, maintenance, and
proper service guidelines.
B-2) Receiving:
Upon receiving the pump, it should be inspected for damage
or shortages. If damage has occurred, file a claim
immediately with the company that delivered the pump. If the
manual is removed from the packaging, do not lose or
misplace.
B-3) Storage:
Short Term-
Barnes Pumps are manufactured for efficient
performance following short inoperative periods in storage.
For best results, pumps can be retained in storage, as factory
assembled, in a dry atmosphere with constant temperatures
for up to six (6) months.
Long Term-
Any length of time exceeding six (6) months,
but not more than twenty-four (24) months. The units should
be stored in a temperature controlled area, a roofed over
walled enclosure that provides protection from the elements
(rain, snow, wind-blown dust, etc.), and whose temperature
can be maintained b40 deg. F and +120 deg. F.
(4.4 - 49°C) If extended high humidity is expected to be a
problem, all exposed parts should be inspected before
storage and all surfaces that have the paint scratched,
damaged, or worn should be recoated with a water base, air
dry enamel paint. All surfaces should then be sprayed with
a rust-inhibiting oil.
Pump should be stored in its original shipping container. On
initial start up, rotate impeller by hand to assure seal and
impeller rotate freely. If it is required that the pump be
installed and tested before the long term storage begins,
such installation will be allowed provided:
1.) The pump is not installed under water for more than
one (1) month.
2.) Immediately upon satisfactory completion of the test,
the pump is removed, thoroughly dried, repacked in the
original shipping container, and placed in a temperature
controlled storage area.
B-4) Service Centers:
For the location of the nearest Barnes Pumps Service
Center, check your Barnes Engineered catalog, your Barnes
Pumps, Inc. representative or Barnes Pumps, Inc. Service
Department in Piqua, Ohio, telephone (937) 778-8947 or
Crane Pumps & Systems Canada, in Brampton, Ontario,
(905) 457-6223.
SECTION C: INSTALLATION
C-1) Location:
The pump is designed to fit into your basin either by sliding
down the rail assembly or by being mounted on a ring base.
THIS PUMP MUST BE INSTALLED WITH A MINIMUM OF
3 INCHES OF CLEARANCE UNDER THE PUMP FOR THE
ENTRANCE OF SEWAGE SOLIDS.
Package Systems (Not Shown)-
The package system
comes complete and ready to place into the ground as
outlined in the project specifications. The moveable portion of
the Break Away Fitting (BAF), check valve, piping and guide
bracket comes assembled on the pump along with the lifting
rope or can be assembled from a moveable kit for the pump
model specified. On units with rail assemblies insert pump
bracket and moveable portion of BAF into the guide channel
and lower pump into basin
(DO NOT DROP)
. On units without
rail assemblies, mount pump on ring base with (3) bolts.
Connect discharge hose assembly and bracket. Once
assembled, unit can be lowered into basin (
DO NOT DROP
).
Now connect power and control cables to the junction box or
control panel depending on system design.
Standard ON
Position
Fig. 1
10"
Standard OFF
Position
Bottom of Basin
12"
4"
Standard ALARM
Position
7
Summary of Contents for SGV2002L
Page 18: ...Fig 10 2HP SGV SERIES 18 ...
Page 19: ...2HP SGV SERIES Fig 11 19 ...
Page 24: ...3 5 7 5HP SGV SERIES Fig 13 24 ...
Page 32: ...NOTES 32 ...