Infrastructure is Present
Access to corporate switch (Intranet)
KVM or monitor/keyboard to set up ethernet port
Browser access (from a separate system with a 1024 x 768 monitor)
Cables at lengths sufficient to connect the system to the user environment
●
Ethernet
●
InfiniBand, Omni-Path (OPA), 40GbE, or 100GbE (depending on the configuration)
Tools
13mm socket wrench
T10 and T20 Torx screwdrivers
Pozidriv screwdriver
61mm/24 inch spirit level (optional)
Work gloves, safety shoes
Personnel
2 people are required for the unpacking process
2 people (minimum) are required to move the rack from the pallet and into its final position
1 person is required to configure and provision the system software
System Updates
SU10
System Access Requirements
Most ClusterStor L300 and L300N software procedures and CSCLI commands require
access to the administrative (
admin
) user account. However,
root
access is required to
perform the system installation procedure. Contact Cray Support for
root
access.
3.1
Service Area Clearances
Before unpacking the ClusterStor L300 and L300N system crate and beginning the installation, verify that
recommended service area clearances are available and that personnel are aware of the safe handling
procedures and precautions.
The top of the rack has cutout holes for cables to be passed into the rack. If cables are to be passed into the rack
from underneath the floor, the recommended cutout is 152.4 mm x 152.4 mm (6 inches x 6 inches) in the rear of
the tile on which the rack is positioned.
Verify that the recommended service area clearances are available at the installation location as shown:
●
45.3in (1150 mm) from the front of the rack
●
25.6 inches (650 mm) from the rear of the rack
●
16.5 inches (420 mm) and 23.6 inches (600 mm) on the side of the rack