ASSEMBLY
ssembly requires two people.
Set the treadmill in a cleared area and remove all packing materials. Do not
terials until assembly is completed.
Assembly requires the included allen wrench
e your
ENERGY BOARD
on a level flat surface.
is recommended that you place a protective covering
A
dispose of the packing ma
Unpacking your
ENERGY BOARD
where will be using it. Being careful
Not to damage . Plac
It
on your floor.
STEP 1
Place
Lower part frame(01)
on a level flat surface.
Attach the
Left and Right handlebar support tube (04,05)
to
Lower part frame
.
Secure it with 4 pcs M5 x 10 Screw(10) and M5 Spring Washer(15) using Cross driver.
STEP 2
Attach the
Main support tube(7)
to Motor case.
Pull out the cable of the Motor case ,
Connect the cable connectors.
mm long socket button head bolt(8),
head bolt(9), 4 pcs M8 spring washer(14),
Wrench.
STEP 3
Secure the
Main support tube
with 2 pcs M8x15
And 2 pcs M8x65mm long socket button
4 Pcs M8 Washer(16)using Allen
Attach the
Left Handlebar(2)
to Left support tube(4)
S
mm Screw(12) using Cross driver.
ecure the Left Handlebar with 2 pcs M5x10
STEP 4
Attach the
Right Handlebar(3)
to Right support tube(5)
.
Secure the Right Handlebar with 2 pcs M5x10mm Screw(12) using Cross driver
STEP 5
Secure the Left Handlebar and Right Handlebar
with 2 pcs M8x40mm long socket button head bolt(11) to Main support tube using Allen Wrench.
STEP 6
Connect the cable connectors (17) and (20).
C
Secure the
Panel case (6)
to Main support tube with 3 pcs M6x10mm Washer Screw using Cross driver.
ergy Board.
onnect the Body Fat sensor line A and B (18,19)
Make sure that all parts are tightened before you use the En
To protect the floor or carpet from damage, place a mat under the Energy Board.
5