background image

www.creo.com

Site Preparation Guide

English

Lotem 400 / 
Lotem 400 Quantum
Family

707-00144D-EN

Summary of Contents for Lotem 400 Series

Page 1: ...www creo com Site Preparation Guide English Lotem 400 Lotem 400 Quantum Family 707 00144D EN...

Page 2: ...rks of their respective owners No copying distribution publication modification or incorporation of this document in whole or part is permitted without the express written permission of Creo Inc In th...

Page 3: ...ditions 9 Floors 9 Electrical 10 Power Quality 10 Heat Output 11 Power Line Voltage Frequency 11 Power Line Disturbances 11 Grounding 11 Air Supply 13 Air Supply Qualification Procedure 14 Cleanliness...

Page 4: ...2 Lotem 400 Lotem 400 Quantum Family Site Preparation Guide...

Page 5: ...site meets all the requirements Proper preparation will help to prevent unnecessary problems and delays when installing the device The following topics are discussed Device configuration Floor space...

Page 6: ...f the latest version of Symantec Antivirus Corporate Edition software They should install it on each of their Creo CTP Systems Creo does not sell Symantec Antivirus software nor do we install or direc...

Page 7: ...the following standard components Platesetter Universal debris removal system1 1 The debris removal system consists of a vacuum pump and filtration system for removing debris from exposed media See t...

Page 8: ...nd their components The measurements are taken facing the Lotem 400 Lotem 400 Quantum Family output devices with the panels installed For measurements of the crates as shipped see Table 6 on page 20 T...

Page 9: ...serial cable Modem power supply can be plugged into UPS Dedicated telephone line and RJ 11 cable to plug into modem must be long enough to reach workstation Cables Supplied by Creo Supplied by custom...

Page 10: ...nly with 5 15R receptacles a The tolerances for input voltages are 6 10 The specification for the frequency is 50 60Hz 1 5 Branch circuits should have time delay type circuit breakers to avoid nuisanc...

Page 11: ...lanet for the recommended work area and dimensions for your specific Lotem 400 Lotem 400 Quantum configuration Allow a recommended minimum 1200 mm 47 24 in at the front of device and 1000 mm 39 37 in...

Page 12: ...n imaging conditions may release largely particulate emissions The UDRC configuration may include various filter options tailored to suit specific qualified media types The configuration for a particu...

Page 13: ...onment please see the UDRC Site Preparation and Requirements document 725 00089A Floors The floor must be level and not subject to high levels of vibration If the customer site is close to heavy car o...

Page 14: ...y UPS device can be ordered directly from a local supplier A UPS is designed to allow the correct and complete shutdown of the device as opposed to a line conditioner that is designed to allow the dev...

Page 15: ...5 See Erratic performance of platesetter Uninterupptable power supply UPS power conditioner requirement document on eCentral Power Line Disturbances The reliable operation of computer systems depends...

Page 16: ...at least equal in size to the phase conductors Ground impedance less than 2 Ohms A single point and dedicated ground Each system load such as platesetter host is fed through an isolated ground outlet...

Page 17: ...amples of typical compressed air systems that you may use For Lotem 400 For Lotem 400 with MCU Configuration Average air consumption Compressor air supply Lotem 400 10 SLPM 0 35 SCFM 70 SLPM 2 47 SCFM...

Page 18: ...y other machines and so on The gauge must never fall below 90 psi at any time during the tests If the air supply fails to maintain this pressure at a minimum it is below specifications for the output...

Page 19: ...in BTU hour are shown in below table Please note the following guidelines The system room should ideally contain both a thermometer and a hygrometer permanently mounted in a central location In additi...

Page 20: ...the level of airborne emissions in the room to ensure that upon installation of the Lotem 400 Lotem 400 Quantum Family the requirements of local state provincial regional and national regulations for...

Page 21: ...he MCE master control electronics end of the PPP connection One for the RAS remote access services connection Media and Processor s The processor specifications may vary and depend on the specific pro...

Page 22: ...s The customer is responsible for satisfying the requirements for achieving optimal plate registration on press For further assistance with specifying punches and benders to be used with the Lotem 400...

Page 23: ...crates and install the device Forklift The customer must provide a forklift or crane with a minimum 1 365kg 3 000 lb capacity for unloading the equipment The width of the forks must not exceed 15cm 6...

Page 24: ...d weights of the crates Table 6 Dimensions and weights of crates Crate Contents Length Width Height Weight Lotem 400 Lotem 400 Quantum Family platesetters 2065 mm 81 3 in 1145 mm 45 08 in 1600 mm 63 i...

Page 25: ...vent contamination and to improve reliability of imaging the Creo output device may include a debris removal system containing a filtration unit either internal or external for example a universal deb...

Page 26: ...d for individual emissions Variation in individual sensitivity to airborne emissions that may cause greater effects in susceptible individuals Tampering with misuse of or incorrect maintenance of imag...

Page 27: ...formation Contact Information Company name Site address Shipping address Contact name Position Telephone fax E mail Prepress manager Maintenance manager Network manager Note All operators must be capa...

Page 28: ...g speed can be affected if media sensitivity or processing is inconsistent with Creo s qualification testing See your Creo representative for specific media information b Some plates may restrict the...

Page 29: ...r and punch the same as those of the device Press es Supported Processor Supported Has the customer met the power and plumbing requirements for the processor Comments on punch condition Yes No Plate b...

Page 30: ...eady installed Will Creo be installing other new equipment during the installation of the Lotem 400 Lotem 400 Quantum Configuration Which autoloader options were ordered Comments Yes No Comments Yes N...

Page 31: ...Is the customer aware that they are responsible for transport of shipping crates from their shipping dock to the installation area 4 Does the forklift to be used meet requirements See Forklift on page...

Page 32: ...eceiving area accommodate a typical air ride truck that is does it have dock level See Shipment and Delivery on page 19 7 Will the room s temperature control system be able to handle the heat load gen...

Page 33: ...10 Does the floor meet the maximum peak loading specification See Floors on page 9 11 What are the AC mains voltages 12 Is power conditioning required If yes has a line conditioner been ordered Comme...

Page 34: ...edicated ground for the device 15 Is the AC service for the workstation installed and originating from the same supply panel as the device AC service 16 Does the air supply flow tested using air suppl...

Page 35: ...ta telephone lines installed 19 What type of network connection is used Part number of measurement tool First Test Second Test Third Test Time on Pressure Time on Pressure Time on Pressure 10 Sec 10 S...

Page 36: ...st are No The location described in this document meets all criteria for a timely and successful installation of the Lotem 400 Lotem 400 Quantum Yes Some follow up is required to ensure that the site...

Page 37: ...ive Signature The Customer understands and hereby agrees to the requirements outlined in the Lotem 400 Lotem 400 Quantum Family Site Preparation Guide including any appendix attached thereto as acknow...

Page 38: ...34 Lotem 400 Lotem 400 Quantum Site Preparation Guide...

Reviews: