Owner's Manual
VE-1P Vertical Edger
Page 13 of 33
SECTION 4 (continued)
4)
Fit the 4 lower rails to the vertical posts and secure them with washers
and nuts. Secure the upper rails in the same manner.
5)
Position the coolant tank on the side of the edger. Under the load conveyor,
connect coolant hose and return hose from coolant pan on edger.
6)
If there is not a wheel installed by the factory, see “MOUNTING
DIAMOND/POLISHING WHEELS” in section 6.
7)
Normally, mix 1 part of
CRL
diamond wheel coolant, CRL Cat.
No. 2651005,
or equivalent, to 100 parts water, or as recommended, in the
coolant tank. For mixing purposes, approximate the capacity of the coolant
tank at 8 gallons (30.2 ltrs). Use approximately 1.2oz (.043kg) of coolant.
Sometimes the coolant and water mixture may foam excessively, thus
requiring sparing use of an anti-foaming agent (Cat. No.
NS31F
).