5.10
Pinto BT-POM 1212 - Revision 5
Lubrication & Maintenance
Motor Valves & Booms
4 Check with the chemical
manufacturer to be sure chemicals
being used are compatible with the
valve
parts.
5 Check the ON/OFF operation of the
valves periodically, especially if
nozzles cannot be seen while
operating.
6 Visually check electrical connections
to ensure they are clean and secure.
Electric Motor-Valve
Maintenance
1 Flush system with clean water after
each day’s use, especially when
using wettable powders.
2 Clean and drain the system for
storage.
3 Do not apply lubricating oils or other
petroleum products to the valves, as
this may cause swelling of the
rubber
parts.
Boom Maintenance
Careful and regular maintenance will
ensure good, long operational life.
Daily Maintenance
Clean the boom at the end of each
working day or whenever the equipment
is stopped for a period of time exceeding
on hour. Rinse the plumbing lines and let
clean water fl ow from the nozzles. Clean
external surface with a water jet.
Ensure nozzles and nozzle bodies are
correctly fi xed and sealed when operating.
also ensure non-drip mechanism are
working.
Grease all grease-points as indicated on
these pages.
Every 50 Hours
Main te nance
Carry out the following maintenance
procedures every 50 hours:
1 Make sure screws of all boom
components are intact and tightened.
2 Retouch damage painted parts.
3 Check stop plugs (C), shown in fi gure
1 (above). Replace them if necessary.
4 Check wear of sliding shoes (D),
shown in fi gure 2 (above).
5-bank motor valves pictured.
Summary of Contents for Pinto 2000
Page 1: ...Pinto Parts Operator s Manual Pinto Part No BT POM00210 Rev 5...
Page 11: ...1 8 Pinto BT POM 1212 Revision 5...
Page 13: ...1 10 Pinto BT POM 1212 Revision 5...
Page 18: ...2 5 Pinto BT POM 1212 Revision 5 Section 2 Safety Please order replacements if required Decals...
Page 88: ...5 3 Pinto BT POM 1212 Revision 5 Section 5 Grease Point Diagrams Boom Grease Points...
Page 109: ...7 2 Pinto BT POM 1212 Revision 5 Assembly Drawings Parts AR135 Pump...
Page 132: ...7 25 Pinto BT POM 1212 Revision 5 Section 7 Plumbing Diagram AR160 AR135...
Page 136: ...7 29 Pinto BT POM 1212 Revision 5 Section 7 Electrical Diagram Optional MT3405F 4 4...
Page 147: ...7 40 Pinto BT POM 1212 Revision 5 Assembly Drawings Parts GBNEWE 18 21C Centre Section 16 21m...