– 15 –
T R A D I T I O N A L S E R I E S C O T T A G E R O O F F R E E S T A N D I N G M O D E L • G R E E N H O U S E I N S T R U C T I O N S
Aluminum Frame Assembly &
Installation
A
B
C
1.
BACK GABLE END
(See page 17)
Take the end wall and slide a bolt
into the corner post and end rafter
(top and bottom) move it down
and up approx. 3" and temporarily
tighten the bolts.
2
.
Take the assembled sidewall and
stand it up on your foundation.
Slide the gutter (sidewall) in
between the end rafter and the
corner post. (There should be a 1/8"
space -
See Pic
).
By sliding the
gutter in as far as it goes, the
punched out slots line up with the
bolt track
(See Pic
).
Undo the
bolts and slide it into the slots and
tighten up. Do the same with the
bottom base
(See Pic
).
3.
SIDEWALL
(Page 18, Step 3)
Place the other sidewall on the
foundation and slide the gutter into
the back end rafter, fasten with bolts,
bolt the base/sill to the corner post.
4.
FRONT GABLE END
Follow the same procedure as the
back gable end
(Page 18, Step 4).
C
B
A
Summary of Contents for Traditional Series
Page 1: ...ACF Greenhouses...