background image

 FP3000 RAID 

USER'S

 

MANUAL

                                           

 

10

   

CROSS T.E.C  

www.crossups.com

 

 

           

3.2.2.

 

Pre-installation

 

Requirement 

               

All

 

the

 

circuitry

 

and

 

the

 

control

 

panel

 

are

 

very

 

delicate

 

parts. 

Hence,

 

the

 

careful

 

handling

 

is

 

required.

   

Sufficient

 

space

 

(about

 

20cm

 

distance)

 

is

 

necessary

 

for

 

the

 

ventilation

 

intake

 

and

 

outlet

 

which

 

are

 

placed

 

in

 

front

 

and

 

back

 

of

 

the

 

equipment

 

for

 

air

 

cooling. 

 

           

3.2.3.

 

Connection

 

of

 

Power 

               

First

 

of

 

all,

 

the

 

size

 

of

 

the

 

cable

 

needs

 

to

 

be

 

calculated

 

according

 

to

 

the

 

necessary

 

capacity

 

of

 

current,

 

and

 

then

 

ensure

 

the

 

position

 

where

 

the

 

cables

 

are

 

connected.

   

Make

 

sure

 

that

 

all

 

the

 

circuit

 

breakers

 

are

 

at

 

"OFF"

 

position,

 

and

 

rearrange

 

the

 

input

 

transformer

 

wiring,

 

as

 

appropriate,

 

depending

 

on

 

AC

 

input

 

power.

   

After

   

completing

   

the

   

wiring

   

of

   

input

   

cables

   

to

   

the

 

relevant

 

terminal,

 

battery

 

cables

 

need

 

to

 

be

 

connected

 

as

 

well

 

with

 

enough

 

care

 

and

 

concern

 

about

 

the

 

positive

 

and

 

the

 

negative

 

cables. 

 

             

Note

:

 

All

 

the

 

connections

 

are

 

to

 

be

 

made

 

FIRM. 

 

4.

 

OPERATION

 

PROCEDURE 

 

     

4.1.

 

Preoperational

 

Requirement 

 

4.1.1.

 

Before

 

starting

 

the

 

operation

 

of

 

the

 

system,

 

the

 

operator

 

(or

 

whoever

               

wants

 

to

 

instruct

 

the

 

machine)

 

is

 

supposed

 

to

 

obtain

 

enough

                     

information

 

and

 

knowledge

 

about

 

start-up,

 

shut-off,

 

repair,

 

routine

                     

check,

 

maintenance,

 

and

 

all

 

other

 

relevant

 

system

 

operation. 

 

4.1.2.

 

Make

 

sure

 

that

 

cables

 

are

 

all

 

at

 

the

 

appropriate

 

places.

   

 

4.1.3.

 

During

 

the

 

maintenance,

 

if

 

the

 

UPS

 

needs

 

to

 

be

 

stopped,

 

check

 

and

                   

ensure

 

that

 

the

 

power

 

is

 

disconnected

 

at

 

least

 

at

 

the

 

service

 

required

               

section,

 

in

 

order

 

to

 

avoid

 

the

 

possible

 

an

 

electric

 

shock.

 

 

     

4.2.

 

Preparations 

 

           

4.2.1.

 

Check

 

and

 

verify

 

that

 

the

 

input

 

circuit

 

breaker(CB1)

 

and

 

the

 

output

                       

circuit

 

breaker(CB3)

 

are

 

in

 

"OFF"

 

position. 

 

 

 

           

4.2.2.

 

Check

 

and

 

verify

 

that

 

all

 

the

 

connectors

 

and

 

the

 

circuit

 

boards

 

are

 

at

                     

Summary of Contents for FP3000

Page 1: ...FP3000 RAID USER S MANUAL 1 CROSS T E C www crossups com USER S MANUAL Frontier power 3000 UNINTERRUPTIBLE POWER SYSTEM CROSS T E C Co Ltd...

Page 2: ...ery 3 2 Installation 4 OPERATION PROCEDURE 4 1 Preoperational Requirement 4 2 Preparations 4 3 Operational Procedure 4 4 Ending Operation Procedure 4 5 Emergency Operation 5 MAINTENANCE AND SERVICES 5...

Page 3: ...onfident and widely known representative product The F3000 RAID Uninterruptible Power System of CROSS TEC is a truly advanced 3 phase on line sine wave UPS which Utilizes new power electronic technolo...

Page 4: ...sipation board and many other components It will convert input AC power to DC power supply the inverter and simultaneously charge the battery with the best condition possible Also the filtering circui...

Page 5: ...he moment of detection of any abnormal operation in inverter or over load condition the static switch will simultaneously transfer the power supply to bypass feed commercial power not to interrupt the...

Page 6: ...quency measurement for each phase 2 Operating condition Rectifier in operation RECT ON Rectifier out of operation RECT OFF Battery equalize charging EQU Battery float charging FLO Inverter in operatio...

Page 7: ...the battery stops to feed and starts to recharge At the same time the commercial power passes through the normal routine 2 3 4 Internal Failure Over load The output voltage and frequency of inverter...

Page 8: ...HASE 3 4 W RATED VOLTAGE 380V VOLTAGE STABILITY Within 2 RATED FREQUENCY 60 Hz 0 5 Hz VOLTAGE REGULATION Within 5 RESPONSE TIME Less Than 20mS VOLTAGE ADJUSTMENT Over 5 WAVEFORM DISTORTION Less than T...

Page 9: ...issing part or any visible damage If found any notify CROSS T E Co immediately Never apply any sharp edged material or tool to the equipment Avoid any form of physical shock to the equipment It may ca...

Page 10: ...t terminal battery cables need to be connected as well with enough care and concern about the positive and the negative cables Note All the connections are to be made FIRM 4 OPERATION PROCEDURE 4 1 Pr...

Page 11: ...ON 4 3 2 Turn the battery circuit breaker CB2 ON According to the amount of charging current detection FLO LED or EQU LED will light ON 4 3 3 PRESS ON button and ENABLE button simultaneously for the I...

Page 12: ...switch together to halt the INVERTER operation and to transfer to bypass mode 4 4 3 Turn OFF the battery circuit breaker CB2 4 4 4 Turn OFF the bypass circuit breaker CB4 4 4 5 Turn OFF the input cir...

Page 13: ...ational range 5 1 3 Ambient surrounding condition out of operational range 5 1 4 Misuse 5 1 5 Component failure 5 1 6 etc 5 2 Handling The static UPS shall be treated and used as a delicate and sensit...

Page 14: ...urement F To check the frequency measurement A To select the power condition of phase R B To select the power condition of phase S C To select the power condition of phase T ON To start the INVERTER o...

Page 15: ...intenance is required It is advisible to record the operational behavior in routine bases for smooth operation and easy service if necessary CATEGORY DESCRIPTION REMARK AC INPUT LED BYPASS INPUT LED I...

Page 16: ...N REMARK ANY DAMAGE ALARMING CONDITION LED INDICATIONS CIRCUIT BREAKERS STATUS LOAD CONDITION REPLACEMENT OTHER STATUS INPUT LINE INVERTER ON BYPASS ON FAULT BUZZER CONDITION SOLUTION ON ON Normal ON...

Page 17: ...ON Button 2 If no change call for service FAULT LED is ON Alarm sounds continuously 2 INPUT LINE LED is OFF 1 Possibly battery cut off 2 If the power recovers PRESS OFF RESET Button 3 If no change ca...

Page 18: ...l abuse improper installation unauthorized service or modification If it becomes necessary to send a defecting unit to CROSS T E Co the product shall be shipped in its original package or with adequat...

Reviews: