background image

 FP3000 RAID 

USER'S

 

MANUAL

                                           

 

8

   

CROSS T.E.C  

www.crossups.com

 

 

 

     

2.4.

 

Electrical

 

Characteristics

   

 

 

TYPE 

FP 3000 RAID 

CAPACITY

 

(

 

KVA

 

 

COOLING

 

MEYHOD 

Forced

 

Air

 

Cooling 

OPERATION 

100%

 

Continuous 

CONTROL 

6

 

Phase

 

Full-Bridge

 

Controlling 

RECT.

 

&

 

CHRG. 

SEMI-CONDUCTOR 

Thyristor 

INVERTER

 

CONTROL 

Instantaneous

 

Sine

 

Wave

 

PWM

 

by

 

IGBT

   

(

 

Individual

 

Phase

 

Controlling

 

ST/SW

 

TRANSFER 

Automatic

 

Synchronized

 

Power

 

Transfer

 

by

 

Semi-Conductor 


TRANSFORMER 

H

 

Class 

No.

 

OF

 

PHASE 

3

 

  

 

4

 

RATED

 

VOLTAGE 

380V 

VOLTAGE

 

VARIATION 

Rated

 

Voltage

 

  

 

10% 


RATED

 

FREQUENCY 

60

 

Hz

 

  

 

5% 

No.

 

OF

 

PHASE 

3

 

  

 

4

 

RATED

 

VOLTAGE 

380V 

VOLTAGE

 

STABILITY 

Within

 

  

 

2%

   

RATED

 

FREQUENCY 

60

 

Hz

 

  

 

0.5

 

Hz 

*

 

VOLTAGE

 

REGULATION 

Within

 

  

 

5% 

*

 

RESPONSE

 

TIME 

Less

 

Than

 

20mS 

VOLTAGE

 

ADJUSTMENT 

Over

 

  

 

5% 

WAVEFORM

 

DISTORTION 

Less

 

than

 

THD

 

3%

 

(

 

100%

 

Linear

 

Load

 

OVER-LOAD

 

CAPACITY 

120%,

 

10

 

Minutes 




POWER

 

FACTOR 

0.8

 

Lag. 

****

 

AUDIBLE

 

NOISE 

60

 

dBA 

**

 

TOTAL

 

EFFICIENCY 

Over

 

87% 

TRANSFER

 

TIME 

Less

 

than

 

4mS 

STATIC 

TRANSFER  TRANSFER

 

CONDITION

   

o

 

INVERTER

 

FAILURE

         

o

 

OVER-LOAD 

   

o

 

DC

 

LOW

 

VOLTAGE

           

o

 

MANUAL

 

TRANSFER 

RATED

 

VOLTAGE 

240V 

MAXIMUM

 

VOLTAGE 

270V 

DC

 

POWER 

MINIMUM

 

VOLTAGE 

210V 

***

 

WITHSTAND

 

VOLTAGE 

AC

 

1500V,

 

60Hz

 

for

 

1

 

Minute 

INSUL-

 

ATION 

***

 

INSULATION

 

RESISTANCE

With

 

DC

 

500V

 

Megger,

 

Over

 

5M  

   

TRANSFORMERS 

Below

 

140

 

Degree 

TEMP. 

RISE 

SEMI-CONDUCTORS 

Below

 

80

 

Degree 

COLOR

 

(

 

CASE

 

COATING

 

5

 

Y

 

7/1

   

(

 

in

 

Munsell

 

No.

 

Summary of Contents for FP3000

Page 1: ...FP3000 RAID USER S MANUAL 1 CROSS T E C www crossups com USER S MANUAL Frontier power 3000 UNINTERRUPTIBLE POWER SYSTEM CROSS T E C Co Ltd...

Page 2: ...ery 3 2 Installation 4 OPERATION PROCEDURE 4 1 Preoperational Requirement 4 2 Preparations 4 3 Operational Procedure 4 4 Ending Operation Procedure 4 5 Emergency Operation 5 MAINTENANCE AND SERVICES 5...

Page 3: ...onfident and widely known representative product The F3000 RAID Uninterruptible Power System of CROSS TEC is a truly advanced 3 phase on line sine wave UPS which Utilizes new power electronic technolo...

Page 4: ...sipation board and many other components It will convert input AC power to DC power supply the inverter and simultaneously charge the battery with the best condition possible Also the filtering circui...

Page 5: ...he moment of detection of any abnormal operation in inverter or over load condition the static switch will simultaneously transfer the power supply to bypass feed commercial power not to interrupt the...

Page 6: ...quency measurement for each phase 2 Operating condition Rectifier in operation RECT ON Rectifier out of operation RECT OFF Battery equalize charging EQU Battery float charging FLO Inverter in operatio...

Page 7: ...the battery stops to feed and starts to recharge At the same time the commercial power passes through the normal routine 2 3 4 Internal Failure Over load The output voltage and frequency of inverter...

Page 8: ...HASE 3 4 W RATED VOLTAGE 380V VOLTAGE STABILITY Within 2 RATED FREQUENCY 60 Hz 0 5 Hz VOLTAGE REGULATION Within 5 RESPONSE TIME Less Than 20mS VOLTAGE ADJUSTMENT Over 5 WAVEFORM DISTORTION Less than T...

Page 9: ...issing part or any visible damage If found any notify CROSS T E Co immediately Never apply any sharp edged material or tool to the equipment Avoid any form of physical shock to the equipment It may ca...

Page 10: ...t terminal battery cables need to be connected as well with enough care and concern about the positive and the negative cables Note All the connections are to be made FIRM 4 OPERATION PROCEDURE 4 1 Pr...

Page 11: ...ON 4 3 2 Turn the battery circuit breaker CB2 ON According to the amount of charging current detection FLO LED or EQU LED will light ON 4 3 3 PRESS ON button and ENABLE button simultaneously for the I...

Page 12: ...switch together to halt the INVERTER operation and to transfer to bypass mode 4 4 3 Turn OFF the battery circuit breaker CB2 4 4 4 Turn OFF the bypass circuit breaker CB4 4 4 5 Turn OFF the input cir...

Page 13: ...ational range 5 1 3 Ambient surrounding condition out of operational range 5 1 4 Misuse 5 1 5 Component failure 5 1 6 etc 5 2 Handling The static UPS shall be treated and used as a delicate and sensit...

Page 14: ...urement F To check the frequency measurement A To select the power condition of phase R B To select the power condition of phase S C To select the power condition of phase T ON To start the INVERTER o...

Page 15: ...intenance is required It is advisible to record the operational behavior in routine bases for smooth operation and easy service if necessary CATEGORY DESCRIPTION REMARK AC INPUT LED BYPASS INPUT LED I...

Page 16: ...N REMARK ANY DAMAGE ALARMING CONDITION LED INDICATIONS CIRCUIT BREAKERS STATUS LOAD CONDITION REPLACEMENT OTHER STATUS INPUT LINE INVERTER ON BYPASS ON FAULT BUZZER CONDITION SOLUTION ON ON Normal ON...

Page 17: ...ON Button 2 If no change call for service FAULT LED is ON Alarm sounds continuously 2 INPUT LINE LED is OFF 1 Possibly battery cut off 2 If the power recovers PRESS OFF RESET Button 3 If no change ca...

Page 18: ...l abuse improper installation unauthorized service or modification If it becomes necessary to send a defecting unit to CROSS T E Co the product shall be shipped in its original package or with adequat...

Reviews: