background image

Installation Instructions

70

-3/4"

15

-3/4"

 

Weight - 236lbs

Weight with water - 779lbs

2

"

 dia

31

-1/2"

20

-1/2"

22

-1/4"

5

6"

2

-1/4"

Tape

measure

Safety

glasses

Set

square

Pencil

Spirit

level

Silicone

sealant

Tools required

2/3 Height = 65 Gal./246L

Installation notes

The installation must comply with all plumbing codes including local 

codes and be installed by a licensed plumbing contractor.
Store the bathtub in a safe place until you begin installation to avoid 

any damage.
Assemble the bathtub on a mat to protect against damage to the 

bathtub surface.
Avoid getting cement, grit, sand or masonry products on to the surface.

Protect and cover the bathtub during the installation period to 
prevent damage from occurring.

Never use brown tape or gaffer tape directly on to the surface. If the 
bath has to be repacked remember to avoid taping directly on to the 
surface of the bathtub.

IMPORTANT

T

urn off the main water supply before connecting to 

any existing pipework or doing any maintenance.
WARNING! Please check for any hidden pipes and cables, electric 

or otherwise

,

 before drilling holes in a wall or floor.

Dimensions

Introduction

This bathtub has been fully inspected throughout the production 
process and only leaves our factory after a 15

-

st

ep

 QC process.

Don’t remove the old fixture before you unpack and inspect the new 
bathtub.

Carefully remove the bathtub from the box, taking care the bathtub is 

carried in the bag and check that all parts have been supplied.
Before beginning installation of the bathtub please check for any 

damage that may have occurred during transport.

 

Note: Damage 

claims cannot be made during or after installation. 

Improper installation shall result in loss of warranty in case of damage 

caused by impacts or rubbing against rough surfaces.
Prior to installing the bathtub prepare a connection of water inlet/outlet.
Pay attention to leveling of floor where the bath

t

ub will be located, 

ensuring it can take the weight of the bathtub and water.
The customer may choose the type and location of the faucets, 

installation instructions should be supplied by the faucet manufacturer.
The installation procedure of the bathtub may differ from that 

described in the installation instructions, depending on where you 

wish the bathtub to be located.
Wet surface of the bath

t

ub may create a risk of slipping which may 

increase by using soap, shampoo, oils and similar products.

IMPORTANT: Please read these instructions carefully before you 

begin and retain for future reference.

We do not accept responsibility for any problems that may occur 

through incorrect installation.

RECOMMENDATIONS:

 

- Walls and floor should be fully tiled and finished before installation.

This ensures that the product is installed flat to the tile face and allows 

the product to be easily removed if required in the future.
- Remove the protective packaging after installation of the bathtub.
- Only fill the bathtub with water up to 2/3 of  its height.
- Use 

US-CW12

 and

 ITD5135

 waste flow products with this bathtub.

Vicenza Grande

 

Bath

t

ub

US-N7DCS

Reviews: