1-2-2
U29PSFP
Safety Check after Servicing
Examine the area surrounding the repaired location for
damage or deterioration. Observe that screws, parts,
and wires have been returned to their original posi-
tions. Afterwards, do the following tests and confirm
the specified values to verify compliance with safety
standards.
1. Clearance Distance
When replacing primary circuit components, confirm
specified clearance distance (d) and (d’) between sol-
dered terminals, and between terminals and surround-
ing metallic parts. (See Fig. 1)
Table 1 : Ratings for selected area
Note: This table is unofficial and for reference only.
Be sure to confirm the precise values.
2. Leakage Current Test
Confirm the specified (or lower) leakage current
between B (earth ground, power cord plug prongs)
and externally exposed accessible parts (RF termi-
nals, antenna terminals, video and audio input and
output terminals, microphone jacks, earphone jacks,
etc.) is lower than or equal to the specified value in the
table below.
Measuring Method (Power ON) :
Insert load Z between B (earth ground, power cord
plug prongs) and exposed accessible parts. Use an
AC voltmeter to measure across the terminals of load
Z. See Fig. 2 and the following table.
AC Line Voltage
Clearance Distance (d), (d’)
220 to 240 V
≥
3mm(d)
≥
6 mm(d’)
Chassis or Secondary Conductor
d
d'
Primary Circuit Terminals
Fig. 1
AC Voltmeter
(High Impedance)
Exposed Accessible Part
B
One side of
Power Cord Plug Prongs
Z
Fig. 2
Table 2: Leakage current ratings for selected areas
Note: This table is unofficial and for reference only. Be sure to confirm the precise values.
AC Line Voltage
Load Z
Leakage Current (i)
One side of power cord plug
prongs (B) to:
220 to 240 V
2k
Ω
RES.
Connected in
parallel
i
≤
0.7mA AC Peak
i
≤
2mA DC
RF or
Antenna terminals
50k
Ω
RES.
Connected in
parallel
i
≤
0.7mA AC Peak
i
≤
2mA DC
A/V Input, Output
Summary of Contents for F5000M
Page 22: ...1 8 3 1 8 4 HG232SCM1 Main 1 5 Schematic Diagram...
Page 23: ...Main 2 5 Sensor Schematic Diagrams 1 8 5 1 8 6 HG232SCM2...
Page 24: ...Main 3 5 Schematic Diagram 1 8 7 1 8 8 HG232SCM3...
Page 25: ...Main 4 5 Jack Schematic Diagrams 1 8 9 1 8 10 HG232SCM4...
Page 29: ...1 8 17 1 8 18 Jack CBA Top View Jack CBA Bottom View BHG470F01014C...
Page 35: ...1 13 1 HG232FEX EXPLODED VIEWS Front Panel A1X...
Page 69: ...F5000M HG232ED 2004 04 22...