INSTALLATION AND OPERATION MANUAL, DIRECT STEAM SINGLE & TWIN MIXER
KETTLE, MODELS DLTM-40 TO DLTM-100 AND DLTM-40-2 TO DLTM-100-2
7.0 MAINTENANCE
(Continued)
B. SETTING THE MIXER SYSTEM FLOW
1. On the operator panel, switch “POWER” to on, “MIXER” to on, and set mixer speed to
“FAST”, the maximum speed.
2. Increase or decrease flow to maximum rpm as listed, or less if requested by customer.
Turn in “C” to decrease, turn out to increase.
40 Gallon Kettle
54 RPM
60 Gallon Kettle
48 RPM
80 Gallon Kettle
43 RPM
100 Gallon Kettle
40 RPM
CAUTION: Do not exceed 54 rpm! Decreasing the flow to less than
10 rpm may over centre
the swash plate and will damage the pump!
3. Use jam nut to lock adjusting screw when complete.
SETTING THE BRIDGE ACTUATOR
1. On the operator panel, switch “POWER” to on, “MIXER” to on, and set mixer speed to
“STOP”.
2. The pressure reducing valve and associated gauge are located at the back of the
hydraulic unit. Adjust it to 800 psi.
3. The speed of the actuator is controlled by an in-line flow control valve also located at the
back of the unit. There is also a locking set screw provided on the adjusting knob.
4. Using the “RAISE/LOWER” tilt switch on the operator panel, adjust the flow control so
that the stroke is completed at a safe speed.
Part No. 10040R4
16
2018-12-05