background image

 

 

UNIT 1 VALENTINES BUILDING 

AINTREE RACECOURSE  

BUSINESS PARK 

AINTREE  

LIVERPOOL  

L9 5AY 

 

JEWEL 

SUNRISE/PETIT/CUBE 

DECORATIVE FUEL EFFECT GAS FIRE 

 

THIS APPLIANCE IS CAT I

2H

 

FOR USE WITH NATURAL GAS 

ONLY 

G20 AT 20mbar 

IN G.B. AND I.E. 

 

USERS 

INSTALLATION & SERVICING 

BOOK

 

issue 3 

1

Summary of Contents for JEWEL CUBE

Page 1: ...RACECOURSE BUSINESS PARK AINTREE LIVERPOOL L9 5AY JEWEL SUNRISE PETIT CUBE DECORATIVE FUEL EFFECT GAS FIRE THIS APPLIANCE IS CAT I2H FOR USE WITH NATURAL GAS ONLY G20 AT 20mbar IN G B AND I E USERS IN...

Page 2: ...ALLATION 7 FIG A 8 INSTALLATION 9 INSTALLATION ODS SERVICING 12 USERS INSTRUCTIONS 14 FUEL LAYOUT 22 REMOTE INSTRUCTIONS NAME MODEL No GC No SUPER HEATRAVE SUNRISE PLEASE READ THESE INSTRUCTIONS CAREF...

Page 3: ...530mm 607mm SIZES INCLUDING TRIM GAS TYPE G20 NATURAL GAS PRESSURE 20 MBAR CONNECTION 8mm OD TUBE SPARK GAP 2 5 4mm INJECTOR MANUAL TYPE CAT 82 460 BRAY INJECTOR REMOTE TYPE CAT 82 440 HEAT INPUT GROS...

Page 4: ...ES IN FORCE FAILURE TO DO SO COULD LEAD TO PROSECUTION REGULATIONS THE FOLLOWING ARE THE RELEVANT CODES OF PRACTICE AND BRITISH STANDARDS BS5781 PART 2 AND 3 1991 BS8303 1986 BS 5440 PART 1 1990 BS 68...

Page 5: ...D SERVICING INSTRUCTIONS FLOOR LEVEL APPLIANCE MUST BE FITTED MINIMUM 300mm TO BOTTOM OF TRIM HEARTH NO PURPOSE MADE HEARTH IS REQUIRED WITH THIS GAS APPLIANCE PROVIDING IT IS WALL MOUNTED AT A MINIMU...

Page 6: ...ANY BRANCHES OR TRAPS WHICH MAY IMPEDE THE NATURAL DRAUGHT IF ANY TERMINAL IS FITTED IT MUST BE SUITABLE FOR THE PURPOSE HEARTH A NON COMBUSTIBLE HEARTH MUST BE PROVIDED BENEATH THE APPLIANCE WITHIN T...

Page 7: ...flue spigot 60mm 300mm 40mm _ 3mm 355mm front view TO SUIT 125mm FLUE LINER CONNECT FLUE LINER TO FLUE SPIGOT AND SECURE LEAVE IN BUILDERS OPENING 25mm ABOVE TOP OF SUNRISE BOX INSERT BOX INTO OPENING...

Page 8: ...IN THE SUPPLY FEED TO THE FIRE TO FACILITATE SERVICING SECURE FIRE TO THE FIREPLACE MARK POSITION OF FLANGE HOLES DRILL AND PLUG AND FIX FIRE TO FIREPLACE ENSURING A GOOD SEAL IS MADE BETWEEN FIREBOX...

Page 9: ...THE DOORS TO THAT ROOM OPENED AND THE EXTRACTOR FAN RUNNING INSTALLATION STEPS FITTING TRIMS FIT THE TRIM WITH FOUR MAGNETS PLACED ON THE VERTICAL SIDE FLANGES OF THE FIREBOX ONE AT THE TOP AND ONE A...

Page 10: ...OW REMOVE FIRE TRAY BY UNSCREWING TWO SCREWS AT FRONT BOTTOM SECTION OF FIRE TRAY REMOVE CONTROL KNOB DISCONNECT GAS CONNECTIONS TO VALVE INCLUDING PILOT CONNECTIONAND THERMOCOUPLE CONNECTION REMOVE L...

Page 11: ...issue 3 11...

Page 12: ...IVE AINTREE RACECOURSE BUSINESS PARK AINTREE LIVERPOOL L9 5AY JEWEL SUNRISE CUBE PETIT DECORATIVE FUEL EFFECT GAS FIRE THIS APPLIANCE IS CAT I2H FOR USE WITH NATURAL GAS ONLY G20 AT 20mbar IN G B AND...

Page 13: ...T ANY RUBBISH BE THROWN ON TO THE FIRE OR THE LAYOUT OF THE FIREBED DISTURBED OPERATING INSTRUCTIONS THE APPLIANCE DATA BADGE IS POSITIONED ON THE FRONT BOTTOM SECTION OF THE APPLIANCE AND CARIES THE...

Page 14: ...D USED ONLY IN A SUFFICIENTLY VENTILATED SPACE CONSULT INSTRUCTIONS BEFORE INSTALLATIONS AND USE OF THIS APPLIANCE FIG 1 CLEANING BEFORE CLEANING ANY PART OF THE FIRE ENSURE THAT THE GAS IS TURNED OFF...

Page 15: ...BED AND BURNER THIS MUST BE REMOVED BY REMOVING FUEL AND BRUSHING ANY DEPOSITS WITH A SOFT BRUSH AND VACUUMING THE BURNER THEN REPLACE FUEL USING THE FOLLOWING PROCEDURE JEWEL GAS FIRE FUEL BED LAYOU...

Page 16: ...LA T SIDE DOWN D B B B spss JEWEL GAS FIRE FUEL BED LAYOUT TOP VIEW TOP FUEL PIECES CURVEDMETALFRONT D D D D D D B B B D B D D D CURVEDMETALFRONT D D D D D D D D D D D CURVEDMETALFRONT D D D D D D D D...

Page 17: ...ONING THIS PROCESS ENABLES THE REAR MATRIX THE FRONT MATRIX AND DRIFTWOOD C TO ENSURE ALL OTHER PIECES ALIGN CORRECTLY LUG LEFT DRIFTWOOD D IS FITTED WITH TWO POINTS AS SHOWN FULLY FORWARD AND AS CLOS...

Page 18: ...G POINTS PIECE I HAS TWO HOLES TO FIT DIRECTLY ON TO LOCATING POINTS FULLY DOWN AND FIRMLY IN PLACE LOCATION POINTS BELOW PIECE I FITS ON TOP OF PIECE C USING LOCATION POINT ON PIECE C AND HOLE IN PIE...

Page 19: ...CAN NOW BE PUSHED CENTRAL UP TO TWO STOP POINTS ON THE BURNER SITTING ON CARRIER ON LEFT AND RIGHT ONCE MAIN LOG IS PUSHED UP TO LUGS THE TWO SIDE LOGS CAN BE PLACED THESE TWO SIDE LOGS ARE HOLLOW AN...

Page 20: ...N NOW BE PLACED ON THE MATRIX BETWEEN THE TWO SIDE LOGS AND TOUCHING THE MAIN FRONT LOG WITH THE POINTS LOOKING OUT AS SHOWN THE TWO FRONT SMALL LOGS NOW SIT ON TOP OF MAIN LOG WITH THE BRANCHES LYING...

Page 21: ...AND ON TOP OF THE HOLLOW LOG AT THE SIDE WITH THE CURVED BRANCH ALSO JUST TOUCHING AT THE BACK THE FOUR SMALL LOGS CAN NOW BE PLACED OVER THE CURVED LOG AND THE TWO SIDES ALLOWING GAPS FOR THE FLAMES...

Page 22: ...N FURTHER LEFT TO ON POSITION SHOWN IN FIGURE 1 ABOVE PILOT GAS FLOWS AND MAIN BURNER FLOWS IN ACCORDANCE TO THE FLAME SETTING KNOB B AS SHOWN IN FIG 1 ABOVE ADJUSTING THE FLAME SETTINGS TO TURN THE F...

Page 23: ...EPLACE BATTERIES ALLOW FIRE TO COOL FOR AT LEAST 30 MINUTES THEN PULL OUT BATTERY HOLDER THE COVER CAN SLIDE OFF AS ABOVE AND THE BATTERIES CAN BE REPLACED USE ONLY LIKE FOR LIKE ALKALINE AA BATTERIES...

Reviews: