background image

Installation / Connection / Measurement 

DP400 mobil V1.00 EN 

Seite 11 von 15 

Test procedure: 

1.)  Both controls , Medium and dry container, have to be closed completely 

2.)  Remove red seal plug and connect the gas input line at 

„ Gas In“. 

3.)  For measurements with gases, except compressed air, the 

„Gas out“ is to change to a suitable 

line output.A secure gas flow out is to ensure. 

4.)  The tightness of all connections is to be checked and ensured. 

5.)  Switch on the display / datalogger. (to press switch on/off button >=3 sec ) 

6.)  Slowly open the control "Medium", max. until the red mark is visible. 

7.)  Allow the gas to flow until the display shows a stable reading. 

8.)  Switch off the unit after completing the measurement 

9.)  Before disassembling the connections, the system must be vented to atmospheric pressure. 

The measuring point should be as close as possible to the critical measuring point in order to obtain a 
truly representative measurement. The length of the DP 400 mobile cable should be as short as 
possible. Only use PTFE piping (supplied) or stainless steel. 

7.2.2  Display / data logger 

The display of the DP 400 mobils is at time of delivery already preconfigurated. 

In addition to the pressure up to 16bar, the dew point (pressure dew point), the temperature, relative 
humidity, absolute humidity (g / m³) as well as other moisture values are measured 

The humidity values are indicated in display channel A1 as well as the pressure on channel B1. 

The DP 400 mobile provides an optional data logger for recording the measured values. (Storage 
capacity 100 million measured values) 

For more details, see instruction manual DS 400 mobil chapter data logger. 

Download Link: 

Instruction manual DS 400 mobile

 

SControl Medium (1) open, 
Rmax. until red marking is visible 

Control dry container (2)closed. 
(completely screwed in) 

Summary of Contents for DP 400 mobil

Page 1: ...DP 400 mobil V1 00 EN Seite 1 von 15 Installation and operating instructions portable dew point meter with integrated pressure measurement DP 400 mobil EN English...

Page 2: ...vour of the DP 400 mobil Please read this installation and operation manual carefully before mounting and initiating the device and follow our advice A riskless operation and a correct functioning of...

Page 3: ...nsors 7 6 Cable cross section 7 6 1 Sensor circuit points Output signal 7 7 Installation Connection Measurement 8 7 1 User controls connection 8 7 1 1 Dew point measurement 8 7 1 2 Display Datalogger...

Page 4: ...ons e g VDE 0100 Carry out maintenance only in strain less state All electric works are only allowed to be carried out by authorized qualified personnel Warning Inadmissible operating parameters Under...

Page 5: ...the Dangerous Goods Legislation requirements The user can transport the batteries by road without further requirements When being transported by third parties e g air transport or forwarding agency s...

Page 6: ...measured values of storage capacity Any analogue sensors 0 4 20 mA 0 1 10 30 V pulse are easy and fast to configure Digital sensors can be connected via RS 485 Modbus RTU Optional Network capable and...

Page 7: ...point 1 C for 20 20 Ctd 2 C for 20 50 Ctd 3 C for 50 80 Ctd Accuray pressure 0 5 Power supply for sensors Output voltage 24 VDC 10 Output current a Digital board 120 mA continuous operation b Analogu...

Page 8: ...y 0 03 mA 0 05 Input resistance 50 Voltage signal 0 1V Measuring range 0 1 V Resolution 0 05 mV Accuracy 0 2 mV 0 05 Input resistance 100 k Voltage signal 0 10 V 30 V Measuring range 0 10 V 30 V Resol...

Page 9: ...0 EN Seite 8 von 15 7 Installation Connection Measurement 7 1 User controls connection 7 1 1 Dew point measurement Plug in connection Medium closed with red seal plug Medium output Control Medium on o...

Page 10: ...ob during operation opens a popup with indication of the remaining operation time The data logger is operated via the touchpanel integrated in the display 7 1 3 Sensor connections Power supply connect...

Page 11: ...vice is compromised Before disconnecting the DP 400 mobile from the gas line it is necessary to vent the system to atmospheric pressure otherwise serious injuries may occur Note At delivery the dew po...

Page 12: ...ng point should be as close as possible to the critical measuring point in order to obtain a truly representative measurement The length of the DP 400 mobile cable should be as short as possible Only...

Page 13: ...ld be activated between the measurements or especially during longer periods of interruption and storage This is to protect the moisture sensor from excessively high moisture and thus to ensure fast r...

Page 14: ...sharp edges The foil can be damaged The DP 400 mobile is pre configured i e the pressure dew point temperature pressure as well as rel humidity are displayed directly on the start screen Configuratio...

Page 15: ...oap For decontamination spray the cleaner on an unused cotton cloth or one way wipe and wipe the component comprehensively Perform the final drying with a clean cloth or by air drying In addition the...

Reviews: