INSTRUCTION MANUAL Digital Light Engraver
5
Initial commissioning, decommissioning
Effective date
30.09.2013
5.2
The preparatory work for the commissioning
Before the commissioning process can begin, the following work has to be
completed:
•
The working area must be cleared and cleaned
•
Protective equipment must be fitted and warning signs must be displayed
•
Transport safety equipment must be removed
Check the following points on the machine and equipment before putting
them into operation
:
•
Accessories are fastened to the electrical and pneumatic components
•
All screw connections are tight and check the screw connection torque
levels, and correct if necessary
•
Utilities such as electricity and compressed air are provided on site, e.g.
compliance with the working materials
•
Power connections
•
Terminals and protective fixtures
•
Carry out, for example, the set up and then functional tests of the electri-
cal and programmable logic controller (PLC)
•
Carry out, for example, the set up and then functional tests of the pneu-
matics, lubrication
•
Carry out, for example, the set up and then functional tests of the control
systems
•
Make sure that loose fittings are tightened and tensions are adjusted cor-
rectly