INSTRUCTION MANUAL Digital Light Engraver
8
Service and Maintenance
Effective date
30.09.2013
8.2
General
Preparing for the service and maintenance
Switch off the machine in accordance with this instruction manual and then
lock the main switch to prevent it from being inadvertently restarted.
If necessary, isolate the machine by pulling the power plug from the mains
supply.
Recommended maintenance intervals
All maintenance instructions given in this chapter refer to a machine operat-
ing under normal conditions.
Recommended inspections and maintenance work
Interval
Maintenance work
Weekly
Visual check
Monthly
Cleaning to be carried out by trained personnel
Biannually
Test linear actuators (refer to technical documenta-
tion)
Annually
Electrical devices and connections
Annually
Security equipment, refer to the capital
tled
“Safety”
Annually
Checks carried out by our service personnel
Measures to be taken before restarting following maintenance work
Check security equipment
Check that the operation sequence of the machine is running trouble-free.
Maintenance of parts supplied by vendors
Please observe all of the information and instructions provided by the respec-
tive manufacturer pertaining to maintenance.
Information pertaining to the maintenance of parts supplied by vendors can
be found in the Technical Annex (Chapter
10. Applicable documents
).
CST GmbH
Königsberger Straße 117
47809 Krefeld - Germany
Page 64 of 69
Betriebsanleitung DLE-AF 01.0 engl.docx