5.8.1.1
Meter Point Detail
Figure 32: Meter point creation – meter point detail
Enter the meter point name, description and the voltage level (nominal voltage)
under which the meter point operates. Click
Next
to continue.
5.8.1.2
Configure Voltage Channels
Figure 33: Meter point creation – voltage channel configuration
Select the installation topology, supply frequency and the declared voltage. Declared
Voltage can be different from the nominal voltage in that the utility can operate the
network at a higher level than designed. This ensure that the client at the furthest
end of the line still receive adequate voltage. The difference in percentage is
indicated next to the declared voltage.
Enter the VT ratios. If the 4
th
channel is used with a VT that has a different ratio than
the main VT, uncheck the
Link Channel 4
checkbox to enter the different ratio for
channel 4. The voltage on the measuring terminal at the nominal primary voltage for
the specified VT ratio is displayed. Click
Next
to continue.
Summary of Contents for Impedo DUO
Page 85: ...Impedo DUO User Guide 85 Figure 49 Export harmonic selection...
Page 109: ...Impedo DUO User Guide 109 Appendices 8 Impedo DUO dimensions...
Page 110: ...Impedo DUO User Guide 110 8 1 Panel mounting plates 8 2 19 installation plate...
Page 111: ...Impedo DUO User Guide 111 9 Impedo DUO wiring diagram...
Page 113: ...Impedo DUO User Guide 113 11 Portable ImpedoDUO...
Page 117: ...Impedo DUO User Guide 117 Screw driver USB with meter key Ethernet cable...