96
CTC EcoLogic M/L
*Only applies to CTC EcoLogic L.
Menu: "Installer/Service/ Function Test/DHW Circulation/Solar/
Pool".
4.11.1.5 Test DHW circ/Solar/Pool*
The following pumps/valves are function tested from this
menu:
DHW circulation pump (G40)
On (On/Off)
Switches the circulation pump on and off.
DHW tank pump (G41)
On (On/Off)
Switches the circulation pump on and off.
Solar panel pump (G30)
0% (0...100)
Tests the circulation pump to full speed (rpm).
Solar heat exchanger pump (G32)
0% (0...100)
Tests the solar heat exchanger pump up to full speed
(rpm).
Solar 3-way valve (Y30)
DHW (DHW/HC)
Tests the two modes on the valve: flow to DHW tank or
buffer tank.
Solar charge borehole (Y31/G31)
Off (On/Off)
Tests the 3-way valve (Y31) and solar heat exchanger
pump (G31).
Pool pumps and valve (G50, G51)
Off (On/Off)
Tests the pool pumps and valve (G50, G51).
4.11.1.6 Test Wood Boiler
The function of the wood boiler is tested in this menu
(On/Off).
4.11.1.7 Test EcoVent*
Exhaust fan M40
0% (0...100)
In this menu, the exhaust fan (M40) is functionally tested
up to full speed (100%).
Summary of Contents for EcoLogic L
Page 2: ......
Page 3: ...162 505 61 2 2021 02 25 Installation and Maintenance Manual CTC EcoLogic L M ...
Page 136: ...136 CTC EcoLogic M L 9 Valves ...
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......