CTC EcoPart 400
General information
105
103
104
98d
100
101
102
99
97
96
98c
98a
c
T
c
98b
96 Level/expansion vessel
97 CTC filling kit
98 Shut-off valve
99 Filter
100 3-way valve
101 External filling pump
102 Mixing vessel
103 Brine pump
104 Evaporator
105 Safety valve 3 bar
Schematic diagram
The filling equipment is represented by the parts displayed with dashes. Note!
Collector hoses must have a bleeding facility as air pockets can occur. Always
check the filter (99) when filling and bleeding the brine system.
!
The mixing vessel
and pump must be
of a good size.