background image

11 

 

2. INSTALLATION 

To  properly  install  the  Managed  Switch,  please  follow  the  procedures  listed 
below. These procedures are described below in separate sections. 
 

 

Installation Requirements 

 

Unpacking the Managed Switch 

 

Installing the Managed Switch 

 

Power on the Managed Switch

 

 

Connecting the Managed Switch to the network

 

 

2.1 Requirement 

Basic requirements for installation are as follows: 

 

Environmental conditions 

-

  One power outlet  

-

  Proper ventilation 

-

  Proper isolation to electrical noise, radio, etc. 

-

  UTP  cables  should  not  run  in  the  same  duct  with  power  and 

phone line cables 

 

Required SFP Transceiver or UTP cables 

 

Rack mounting tools 

 

2.2 Checking the Package Contents 

Unpack  the  package  carefully  and  check  the  package  contents.  The  package 
should contain the following items: 

 

Standard 

-

  One Managed Switch 

-

  Mounting kit: 2 mounting brackets and screws (Fixed in the 

Managed Switch when shipped) 

-

  Four rubber feet with adhesive backing 

-

  Console RS-232 cable with RJ-45 connector 

-

  Documentation CD 

-

  AC power cord (For AC power module only) 

Summary of Contents for FOS-3124-BAT-II Series

Page 1: ...FOS 3124 BAT II Series 20 PORTS 100 1000BASE X SFP WITH 4 COMBO PORTS 10 100 1000BASE T 100 1000BASE X SFP UPLINK MANAGEMENT SWITCH User s Guide Version 0 91...

Page 2: ...al area is likely to cause harmful interference in which case the user will be required to correct the interference at their own expense CE Mark Warning This is a Class A product In a domestic environ...

Page 3: ...3 Revision History Version Date Description 0 90 20150209 First release 0 91 20150707 Specification Rearrangement...

Page 4: ...k Management 10 2 INSTALLATION 11 2 1 Requirement 11 2 2 Checking the Package Contents 11 2 3 Install the Managed Switch 12 2 4 Power ON 13 2 5 Connect the Switch to network 15 3 OPERATION 16 3 1 LED...

Page 5: ...h is compact 19 inch and rack mountable and has 20 100 1000Mbps SFP ports and 4 combo ports either 10 100 1000 copper or 1000Mbps SFP connectivity on the front panel This Managed Switch provides high...

Page 6: ...port up to 2K VLAN Groups Support jumbo frame on all ports up to 9K bytes size QoS classification based on IEEE802 1p VID TOS DSCP Ethertype and L4 port Q in Q VLAN double tag Rate limit control SNTP...

Page 7: ...r 10 seconds then release to reset back to factory settings and restart the system Please note that this will clear all saved passwords and configurations 20 100 1000 SPF ports The SFP ports are numbe...

Page 8: ...y Step 1 Unplug AC power Step 2 Disconnect battery negative from switch negative Step 3 Disconnect battery positive from switch positive Step 4 Connect battery positive to switch positive Step 5 Conne...

Page 9: ...SE ZX Single mode fiber module 80km Mini GBIC SFP Transceiver for 1000BASE SX Multi mode fiber module 550m SFP Transceiver for 1000BASE LX Single mode fiber module 10km SFP Transceiver for 1000BASE LH...

Page 10: ...to the Managed Switch users can use Telnet to configure control and monitor the system Using network connection to manage is often referred to In Band Management SNMP Management SNMP is also In Band M...

Page 11: ...ne power outlet Proper ventilation Proper isolation to electrical noise radio etc UTP cables should not run in the same duct with power and phone line cables Required SFP Transceiver or UTP cables Rac...

Page 12: ...onnector Make sure that there is proper heat dissipation from and adequate ventilation around the switch Do not place heavy objects on the Managed Switch Desktop Installation The switch can be placed...

Page 13: ...ment rack to mount the switch into the selected mounting rails position carefully and firmly 5 Please ensure that the ventilation holes are not blocked 2 4 Power ON The Managed Switch can be used with...

Page 14: ...is plugged into the switch at the back of the device When power is resumed plug the power back to the switch Please note that the Managed Switch has no ON OFF switch Therefore the only way to power o...

Page 15: ...FP ports and 4 combo ports on the front panel These combo ports can be plug in 10 100 1000Base T copper or slide in 100 1000Mbps SFP Fiber transceivers The connection of the fiber port must be matched...

Page 16: ...r receiving power or DC output fails Status LED LED Color Operation Status Green The device is in normal operation Orange The device is booting up Green Blinking Press the Reset button for 3 seconds a...

Page 17: ...Operation Charge Off Battery is disconnected Green 1 Power module is in normal operation 2 Back up battey fully charged Green Flashing Back up battery is charging Discharge Orange 1 The Managed Switch...

Page 18: ...uration through console connection When the whole system fails to function 1 Check Power LED status 2 Check Power connection 3 Reset power When certain network link fails to function 1 Locate the port...

Page 19: ...e this warning could result in personal injury or death from electrical shock Failure to observe the above warning will immediately void any Warranty 4 3 Firmware Upgrade This Managed Switch may perfo...

Reviews: