17
S
ection
6 — M
aintenance
& a
djuStMentS
Auger Shaft
At least once a season, remove the shear pins from the auger
shaft. Spray lubricant inside the shaft and around the spacers and
the flange bearings found at either end of the shaft. See Figure
6-4.
Shear Pin
Bow-Tie Cotter Pin
Figure 6-4
Adjustments
Shift Cable
If the full range of speeds (forward and reverse) cannot be
achieved adjust the shift cable as follows:
1.
Place the shift lever in the fastest forward speed position.
2.
Loosen the hex nut on the shift cable index bracket. See
Figure 6-5.
Figure 6-5
3.
Pivot the bracket downward to take up slack in the cable.
4.
Retighten the hex nut.
Auger Control
Refer to the Assembly and Set-up section for instructions on
adjusting the auger control cable.
Skid Shoes
Refer to the Assembly and Set-up section for instructions on
adjusting the skid shoes.
Track Tension
Over time the track can stretch. Adjust the track tension as
follows (See Figure 6-6):
“J” Bolt
Front Track
Idler Wheel
Hex Nut
Flange Lock Nut
Track Side Plate
Figure 6-6
1.
Loosen the hex nuts on the front track idler wheels on each
side of the snow thrower.
2.
Tighten the flange lock nut on the front of the track side
plate. This pulls the “J” bolts attached to the axle and
tightens the tracks.
3.
Tighten the hex nuts on the front track idler wheels.
Summary of Contents for 2X 728 TDE
Page 26: ...Notes 11 26 ...
Page 27: ...27 Section 11 Notes ...