11
Raise the front hitch so that the snow blower is off the
22.
ground; then stop the tractor engine and engage the parking
brake.
Check to verify that the snow blower pin is fully seated into
23.
the front hole of the ‘A’ frame. If not, push the pin rearward to
fully engage the ‘A’ frame.
Lower the blower to the ground then mount the snow blower
24.
drive shaft to the stub shaft by sliding the pulling the locking
collar back and sliding the PTO on to the stub shaft until the
PTO locks.. See Figure 8.
WARNING! Do not attempt to connect the drive
shaft when the tractor engine is running. Stop the
tractor engine, disengage all PTO controls, en-
gage the parking brake, and wait for all movement
to stop before connecting the snow blower drive
shaft.
Stub Shaft
Drive Shaft
‘A’ Frame not show for clarity
figure 8
Mounting the Chute
NOTE:
Grease the chute base before attaching. See Figure 9.
The chute was shipped with two of the chute clamps attached. To
attach the chute, place it onto the chute base and secure it with
the one remaining chute clamp using the clamp, spacer,
1/4-20 x
1.00
carriage screw and
1/4-20
hex lock nut from the screw pack.
See Figure 9.
Mounting the Chute Crank
To mount the chute crank you will need to two 3/8-16 x 3.50 Hex
Screws and two 5/16-18 x .1.00 hex bolts.
Mount the chute crank to the side of the chute base with the
1.
hex screws. See Figure 10.
Mount the support tube on the horizontal bracket below the
2.
chute base using the 5/16-18 x 1.00 bolts and flange nuts.
See Figure 10.
Chute
Spacer
Clamp
Hex Screw
Chute Base
Hex Lock Nut
Mounting Holes
Bottom of Chute
figure 9
Support Tube
Chute Crank
Hex Screws
Hex Bolts
figure 10
Summary of Contents for 59A40051727
Page 17: ...17 Notes page ...