CUB CRAFTERS, INC.
CC11-160 MAINTENANCE MANUAL
5.4.14
Manual number SSC10000AMM
Page: 2
Date: 10/28/2010
1. GENERAL
Refer to Chapters 6.3.17 and 6.3.19 for servicing of the electrical systems. No major repair or
alterations, as outlined in ASTM F2483, FAR 43, or in this manual are authorized at this time.
To obtain engineering approvals for any major repairs or alterations, please contact Cub
Crafters at:
Cub Crafters, Inc.
1918 South 16
th
Avenue
Yakima, WA. 98903
Tel: 509-248-9491
support@cubcrafters.com
2
ELECTRICAL POWER SYSTEMS
(1) GENERAL
The aircraft uses a 14 volt DC electrical system with the power supplied by a 40 amp belt-
driven alternator and a 12 volt storage battery. Some aircraft are equipped with a 12 volt
ignition battery backup.
In addition to the alternator and the battery, the electrical system consists of a solid-state linear
regulator, master and starter solenoids, circuit breakers, and switches. The battery is located
underneath the pilot’s seat. If installed, the Ignition Backup Battery is located behind the right
front interior panel. Refer to Chapter 6.3.19 for the maintenance of electrical power systems.
Summary of Contents for CARBON CUB SS CC11-160
Page 2: ...INTENTIONALLY LEFT BLANK...
Page 23: ...CHAPTER 5 AIRCRAFT MAINTENANCE MANUAL...
Page 24: ...INTENTIONALLY LEFT BLANK...
Page 115: ...CHAPTER 6 LINE MAINTENANCE REPAIRS AND ALTERATIONS...
Page 116: ...INTENTIONALLY LEFT BLANK...
Page 325: ...CHAPTER 7 HEAVY MAINTENANCE REPAIRS AND ALTERATIONS...
Page 326: ...INTENTIONALLY LEFT BLANK...
Page 331: ...CHAPTER 8 OVERHAUL...
Page 332: ...INTENTIONALLY LEFT BLANK...
Page 339: ...CHAPTER 9 MAJOR REPAIRS AND ALTERATIONS...
Page 340: ...INTENTIONALLY LEFT BLANK...
Page 345: ...CHAPTER 10 TASK SPECIFIC TRAINING...
Page 346: ...INTENTIONALLY LEFT BLANK...
Page 351: ...CHAPTER 11 SAFETY DIRECTIVES COMPLIANCE...
Page 352: ...INTENTIONALLY LEFT BLANK...