5.1
PRE-SPRAY CHECK LIST
1. Verity that the formulation pump has been calibrated and is dispensing formulation in
accordance with the manufacturers label requirements.
2. Verify that the adjustable nozzle boom is in the correct position as required for the
spraying operation to be accomplished, and that the ring clamp which allows this
positioning is tight.
3. Verify that the engine has sufficient fuel and is properly lubricated.
4. Verify that the blower has been serviced.
5. Inspect all hoses for abnormal conditions.
6. Verify that no foreign objects or tools have been left in or about the machine.
7. Verify that the sufficient amount of formulation is in the tank and that the tank filling
cap is tight and its air vent hole is not clogged.
8. Verify that the battery is mounted securely and cable connections are proper.
9. Verify that all safety equipment is in place and is in proper working order.
10. Verify that the remote control box is within easy reach of the operator.
CAUTION
Before proceeding with any spraying operation, the operator should be
thoroughly familiar with starting and stopping the machine and with all the
operating controls. If you are operating the machine for the first time, exercise
the machine through its full operational sequences from a position of full
visibility of the machine before operating the machine fully remote. This is also a
good idea for experienced operators who may be operating a new machine or
who may be reactivating a machine after repairs or a period of inactivity. Refer to
the engine manual for starting and stopping the engine.
16