25
PREVENTIVE MAINTENANCE
NOTE:
A successful maintenance program begins after the first use of the
machine and not after the machine has ceased to function.
PREVENTIVE MAINTENANCE:
1
.
Occasionally inspect mounting hardware to ensure that fasteners are tight.
Loose hardware can cause excessive vibration leading to major failure of
components.
2.
Acquaint yourself with the operating sounds of your machine. Strange
sounds suddenly appearing can be a forewarning of difficu
l
ties which may be
preventable with immediate action.
3.
Keep the machine clean externally as well as internally. Some insecticides
contain chemicals which are corrosive.
BATTERY
WARNING
Batteries produce explosive gases. Keep sparks and flames away. Ventilate when
charging or using in enclosed space. Always shield eyes when working near
batteries. The battery contains sulfuric acid and can cause severe bums. Avoid
contact with skin, eyes and clothing.
1
.
Check battery fluid level each week. If the level is low, add distilled water. After
initial activation of battery, never add additional electrolytic fluid. Distilled water is
preferred.
2.
Check vent holes in battery and remove any obstructions such as dirt, corrosion
etc.
3.
Inspect posts and remove any corrosion build-up using water and baking soda.
4.
Apply an anti-corrosion compound or a light coating of petroleum jelly to battery
terminals to minimize corrosion.
Summary of Contents for MAXI-PRO 2D ULV
Page 6: ...6 MAJOR COMPONENTS DIAGRAM ...
Page 9: ...9 ...
Page 39: ...39 ...
Page 43: ...43 BOOM ASSEMBLY MAXI PRO 2D P N 64905 ...
Page 50: ...50 ...