CAB INSTALLATION
12 of 28
STEP 14: (TIGHTEN HARDWARE)
14.1
Tighten all hardware at this time
,
using the torque values
found on the last (2) pages of this manual.
Note:
Each side frame can be pushed inward at the back to
close any gaps along the fender contour before
tightening hardware.
Note: Suggested tightening sequence is as follows:
Floorboards, cowl, rear mounts, rear legs, lower rear
panel, roof, and ROPS brackets.
14.2
Once all hardware is fully tightened, remove the (2)
quick grip clamps from the roof/rear legs.
Fig. 13.1 (Roof Preparation)
Fig. 13.2a (Roof Fasteners)
Fig. 13.3 (Squaring of Rear Legs and Roof)
STEP 13: (ROOF)
13.1
Per figure 13.1, pierce the headliner in (6) places where
the rubber plugs were previously removed. Use a
screwdriver to poke holes through the headliner from
the headliner side up through the hole in the roof to
avoid having the headliner pull away from its glued
surface.
13.2
With assistance, set the roof on top of the cab. Loosely
secure with (6) screws and plastic seal washers on the
top of the roof into the windshield support and side
frames. With an additional (2) screws and nuts on back
edge of the roof into the rear legs. See Figures 13.2a
and 13.2b.
Hardware Used
Qty
5/16
-
18 x
3/4”
Hex Head Screw
8
5/16”
Plastic Seal Washer
6
5/16
-
18 Flange Hex Nut
4
Tools required
1/2”
Wrenches and/or Sockets
13.3
Once all roof fasteners are started, measure the width
of the rear legs (outside to outside). Adjust the width if
needed to
27
-
7/8”.
Measure opening corner to corner
for squareness and clamp the rear flange of the roof to
each of the rear legs. If necessary a bar clamp may be
used to pull the rear legs in to
27
-
7/8”.
See Figures
13.2b and 13.3.
Note: Leave the clamps in place until all cab fasteners are
tightened during the following steps.
Tools required
(2) Quick Grip Clamps
Tape Measure
27
-
7/8”
5/16
-
18 Nuts
5/16”
Seal Washers
Fig. 13.2b (Roof Fasteners)
Pierce headliner here
5/16
-
18
Nuts
5/16
-
18 x 3/4 Screws
5/16
-
18 x
3/4 Screws
Clamp Here