background image

Chapter 1  Introduction  

 

User Manual, MAR-5915-3x 

 

 

Page 4 of 39 

MNL-0659-01  Rev A7 

ECO-5592 

05 Feb 19 

 

Chapter 4  Environmental Specifications .............................................................................. 36

 

Thermal ................................................................................................................................................. 36

 

Shock .................................................................................................................................................... 36

 

Vibration ................................................................................................................................................ 36

 

Humidity ................................................................................................................................................ 36

 

Sealing .................................................................................................................................................. 36

 

Altitude .................................................................................................................................................. 36

 

EMI/EMC .............................................................................................................................................. 36

 

Input Voltage ......................................................................................................................................... 36

 

Chapter 5  Troubleshooting ................................................................................................... 37

 

Product Identification ................................................................................................................................... 37

 

Technical Assistance .................................................................................................................................. 37

 

Returning for Service .................................................................................................................................. 37

 

Chapter 6  Contact Info ........................................................................................................... 38

 

Summary of Contents for Parvus DuraMAR 5915-3X

Page 1: ...USER MANUAL Parvus DuraMAR 5915 3X Rugged Cisco 5915 Mobile Access Router combined with Parvus SWI 22 10 Gigabit Ethernet Switch MNL 0659 01 Rev A7 ECO 5592 Effective 05 Feb 19 ...

Page 2: ...rtiss Wright This document contains proprietary information that is protected by copyright All rights are reserved No part of this document may be photocopied reproduced or translated into another language without the prior written consent of Curtiss Wright Contact Information Defense Solutions Division Curtiss Wright 3222 S Washington St Salt Lake City Utah USA 84115 Phone 1 801 483 1533 Toll Fre...

Page 3: ...OU 15 Enabling Zeroization for the Parvus SWI 22 10 SWI 15 Initiating Zeroization 16 Zeroization Recovery 17 Loading the ROU IOS Image after Zeroization 17 Loading the ROU IOS Configuration after Zeroization 18 Loading the SWI configuration after Zeroization 18 Installation 19 Orientation 19 Choosing a Mounting Location Thermal Considerations 19 Vertical Mounting 20 Horizontal Mounting 21 Groundin...

Page 4: ... 5592 05 Feb 19 Chapter 4 Environmental Specifications 36 Thermal 36 Shock 36 Vibration 36 Humidity 36 Sealing 36 Altitude 36 EMI EMC 36 Input Voltage 36 Chapter 5 Troubleshooting 37 Product Identification 37 Technical Assistance 37 Returning for Service 37 Chapter 6 Contact Info 38 ...

Page 5: ...ables 11 Figure 2 SWI ring cables 11 Figure 3 Mounting Holes 20 Figure 4 Side Mounting Holes 21 Figure 5 Rear View 22 Figure 6 MAR 5915 3x Connectors 23 Figure 7 Connector J1 Power 24 Figure 8 Connector J2 ETH 0 25 Figure 9 Connector J3 CON 26 Figure 10 J2 LED Mapping to J2 Signal Name and Cisco Port Name 27 Figure 11 Front Panel Dimensions 35 ...

Page 6: ... that are unique to the combined system Description of Safety Symbols The following symbols are used in this manual to indicate important information and potentially dangerous situations Warning Danger electrical shock hazard Personal injury or death could occur Also damage to the system connected peripheral devices or software could occur if the warnings are not followed carefully Caution Hazard ...

Page 7: ...aNET 2010 by combining them in a single system An internal connection links these two components MAR 5915 port FE 0 4 is internally connected to SWI 22 10 card port GE2 The Cisco 5915 router is physically housed in the DuraSTAX ring labeled ROU hereafter referred to as the ROU ring The SWI 22 10 switch card is also physically housed in the DuraSTAX ring labeled SWI hereafter referred to as the SWI...

Page 8: ...Aggregation IEEE 1588 Precision Timing Protocol Layer 3 IPv4 IPv6 Unicast Static Routing support for IP routing to attached WAN radios SNMPv3 HTTP Server web GUI RS 232 console CLI Port Monitoring RMON Syslog Network Access Server NAS 802 1X Authentication IGMP Snooping Access Control Lists ACLs zeroization built in test BIT diagnostics Rugged MIL STD Design Qualified for MIL STD 810G and DO 160G ...

Page 9: ...T 20 10 GigE Switch MAR 5915 00 DUNET 20 10 01 5915 BaseIOS MAR 5915 31 DuraMAR 5915 Router w DuraNET 20 10 GigE Switch MAR 5915 01 DUNET 20 10 01 5915 AdvIOS MAR 5915 32 DuraMAR 5915 Router w DuraNET 20 10 GigE Switch MAR 5915 02 DUNET 20 10 01 5915 AdvIOS CME5 MAR 5915 33 DuraMAR 5915 Router w DuraNET 20 10 GigE Switch MAR 5915 03 DUNET 20 10 01 5915 AdvIOS CME25 MAR 5915 34 DuraMAR 5915 Router ...

Page 10: ...Chapter 1 Introduction User Manual MAR 5915 3x Page 10 of 39 MNL 0659 01 Rev A7 ECO 5592 05 Feb 19 Block Diagram System Block Diagram Detailed Ethernet and Power Block Diagram ...

Page 11: ...stem These cables are suitable for bench top testing and proof of concept setups The same cable set works with all 3X models Final installation should use custom cables designed for the target environment Refer to Chapter 3 Connector and LED Descriptions for information required to design custom cables Figure 1 ROU ring cables Figure 2 SWI ring cables power cable shown is not part of the SWI ring ...

Page 12: ...9 J3 ROU Console and Zeroize Test cable DB 9 1 ROU RS 232 serial console port cable Flying leads 2 ROU SWI Zeroize and Ground wire CBL 2555 01 38999 J4 SWI Gigabit Ethernet ports console port and zeroize DB 9 1 SWI Console port RJ 45 12 SWI Gigabit Ethernet ports 1 12 GE1 GE12 Button 1 ROU SWI Zeroize CBL 2554 01 38999 J5 SWI Gigabit Ethernet ports RJ 45 8 SWI Gigabit Ethernet ports 13 20 GE13 GE2...

Page 13: ... to the unpowered DC power source Caution Make sure that the DC power source is set to provide 9VDC to 36VDC 28V nominal 3 Connect a serial cable to the serial port on the host PC and to J3 for ROU configuration or J4 for SWI configuration 4 Open a terminal emulator on the host PC 5 In the PC terminal emulation software for ROU communication configure the serial port for 9600 bits per second 8 dat...

Page 14: ... IOS files Vitesse CE Services Configuration The SWI SWI 22 10 is shipped with Vitesse CE Services Carrier Ethernet application installed For guidelines in configuring the switch refer to the Chapter 3 of the DuraNET 20 10 Manual MNL 0653 01 Vitesse CE Services Upgrade This procedure assumes that you have already acquired a dat upgrade file from the factory From a PC connected to the switch point ...

Page 15: ...ization From an IOS prompt enter the following commands Router enable Router conf t Router config service declassify erase all Router config exit The erase all argument will erase all files on the router flash and NVRAM when declassification zeroization is invoked erase flash or erase nvram may be substituted for erase all if only the files in flash memory or NVRAM respectively are to be deleted E...

Page 16: ... triggers zeroization of that ring Hardware Method ROU SWI Zeroization is triggered by pulling the zeroize signal low 0v If you have CBL 2419 01 trigger zeroization by connection the yellow wire zeroize to the green wire ground Caution This differs from the MAR 5915 0x and 1x systems The 0x and 1x systems require 12v to trigger zeroization DO NOT apply 12v to the zeroize signal on MAR 5915 3x or s...

Page 17: ...hout a problem Load Procedure There should be a rommon prompt in the terminal emulator window If the rommon prompt is not displayed reboot the DuraMAR 5915 and wait for the rommon prompt 1 At the rommon command prompt type the following CASE SENSITIVE commands press Enter after each command the filename itself is NOT case sensitive IP_ADDRESS 192 168 100 10 IP_SUBNET_MASK 255 255 255 0 DEFAULT_GAT...

Page 18: ...y tftp command 11 Power off the system 12 Power on the system 13 After the reload completes press Enter to display a Router prompt The Cisco 5915 IOS configuration has been successfully reloaded Loading the SWI configuration after Zeroization Zeroization erases the configuration data stored in startup config When the switch is restarted after power down the switch will start up with the factory de...

Page 19: ...nsiderations The DuraMAR5915 3X enclosure is highly efficient at removing heat from the inside of the unit to the outside of the finned enclosure It is best to mount the unit on a thermally cool thermally conductive surface to keep the overall temperature as low as possible Every effort has been made to meet stringent thermal performance criteria as outlined in the specifications However it is alw...

Page 20: ...Create a hole pattern on the mounting surface that matches the pattern shown in Figure 3 Mounting Holes The mounting holes are 0 27 in diameter 15 Attach the baseplate to the mounting surface using the four mounting holes Attachment screws should be 1 4 20 Important Ensure that mounting screw length allows proper thread engagement of the mounting hardware Figure 3 Mounting Holes ...

Page 21: ...ting surface that matches the pattern shown in Figure 4 The mounting holes are 0 33 in diameter 2 Attach the switch to the mounting surface using the two side mounting holes Attachment screws should be 5 16 18 Important Ensure that mounting screw length allows proper thread engagement of the mounting hardware but is not so long that the screw bottoms out in the side mounting hole Figure 4 Side Mou...

Page 22: ...le for attachment of a grounding cable using a 1 4 20 bolt is provided on the rear of each ring of the system Figure 5 Rear View It is recommended that you use only one grounding hole Choose the grounding hole that allows the shortest grounding cable length Caution The grounding lug tie holes are shallow 0 375 Select the proper screw length for your grounding application and avoid over tightening ...

Page 23: ...tor part numbers along with suggested mating connector details It also provides LED indicator descriptions Figure 6 MAR 5915 3x Connectors ROU ring Connector Identification and Mapping Connector Label Description Part Number Mating Connector J1 PWR 12 36 VDC 28v Nominal Power Input D38999 20FA98PN D38999 26FA98SN J2 ETH 0 2X 10 100 Switched 2X 10 100 Routed D38999 20FC35SN D38999 26FC35PN J3 CONSO...

Page 24: ...24 of 39 MNL 0659 01 Rev A7 ECO 5592 05 Feb 19 J1 PWR Pinouts J1 provides power input signals for 28V power to the Parvus Power Supply Figure 7 Connector J1 Power P N D38999 20FA98PN Shell Size 9 J1 Signal Name Description 38999 Pin V 28 VDC A V 28 RTN C Chassis Chassis B ...

Page 25: ...inout The ROU ring provides two switched and two routed ports to the outside Ports 0 and 1 are the routed ports ports 2 and 3 are the switched ports Note Port 4 is internally connected to SWI port FE18 J2 Signal Name Description 38999 Pin ETH 0_PORT0_TX 10 100 TX 0 1 ETH 0_PORT0_TX 10 100 TX 0 2 ETH 0_PORT0_RX 10 100 RX 0 3 ETH 0_PORT0_RX 10 100 RX 0 4 ETH 0_PORT1_TX 10 100 TX 1 5 ETH 0_PORT1_TX 1...

Page 26: ...he DuraMAR 5915 front panel socket side appears as an exact mirror of the picture on the left P N D38999 20FB35SN Shell Size 11 J3 Signal Name Description 38999 Pin Zeroize Zeroization of System 2 GND Signal Ground Used for zeroization 1 CONS_TXD_RS232 Console Transmit Data 10 CONS_DTR_RS232 Console Data Terminal Ready 8 CONS_RTS_RS232 Console Ready to Send 9 CONS_RXD_RS232 Console Receive Data 12...

Page 27: ...er Steady green light indicates steady state IOS load completed and running R0 R1 Routed Ethernet ports 0 0 and 0 1 on connector J2 Steady green light indicates link status S0 S1 S2 Switched Ethernet ports 0 2 0 3 and 0 4 on connector J2 Steady green light indicates link status Figure 10 shows the mapping of Cisco port names to J2 signal names and to the LED labels on the front panel Figure 10 J2 ...

Page 28: ...fication and Mapping The following table shows the port mapping for each connector on the SWI Ring identified in Figure 6 Connector Label Part Number Function Port Mapping Mating Connector J4 ETH1 D38999 20FH35BN 12x Gig Ethernet Console Zeroize GE1 12 Console D38999 26FH35PN J5 ETH2 D38999 20FF35BA 8x Gigabit Ethernet G13 20 D38999 26FF35PA ...

Page 29: ..._A_N 58 GbE9_A_N 28 GbE11_A_N 13 GbE1_B_P 40 GbE3_B_P 83 GbE5_B_P 60 GbE7_B_P 69 GbE9_B_P 29 GbE11_B_P 7 GbE1_B_N 41 GbE3_B_N 73 GbE5_B_N 50 GbE7_B_N 68 GbE9_B_N 39 GbE11_B_N 20 GbE1_C_P 42 GbE3_C_P 85 GbE5_C_P 71 GbE7_C_P 67 GbE9_C_P 27 GbE11_C_P 12 GbE1_C_N 43 GbE3_C_N 76 GbE5_C_N 61 GbE7_C_N 77 GbE9_C_N 37 GbE11_C_N 6 GbE1_D_P 30 GbE3_D_P 74 GbE5_D_P 72 GbE7_D_P 78 GbE9_D_P 38 GbE11_D_P 5 GbE1_...

Page 30: ...GbE15_A_N 15 GbE17_A_N 42 GbE19_A_N 51 GbE13_B_P 18 GbE15_B_P 16 GbE17_B_P 49 GbE19_B_P 58 GbE13_B_N 19 GbE15_B_N 9 GbE17_B_N 41 GbE19_B_N 60 GbE13_C_P 17 GbE15_C_P 13 GbE17_C_P 47 GbE19_C_P 65 GbE13_C_N 25 GbE15_C_N 7 GbE17_C_N 48 GbE19_C_N 59 GbE13_D_P 26 GbE15_D_P 8 GbE17_D_P 39 GbE19_D_P 64 GbE13_D_N 27 GbE15_D_N 3 GbE17_D_N 40 GbE19_D_N 36 GbE14_A_P 1 GbE16_A_P 33 GbE18_A_P 66 GbE20_A_P 37 Gb...

Page 31: ...g policing per queue and per port Storm Control VLAN 8K MAC addresses 4K VLANs 802 1Q Static VLAN Protocol Based VLAN MRP MVRP MVR IEEE 80210ad Provider Bridge Link Aggregation IEEE 802 3ad IEEE 802 1 D w s Spanning Tree Rapid Spanning Tree Multiple Spanning Tree Protocol L2 IEEE 1588v2 Precision Timing Protocol PTP Layer 3 Routing Layer 3 IPv4 IPv6 Unicast static routing support for IP routing to...

Page 32: ...e Support Advanced IOS add on option Routing Bridging IPv4 and IPv6 Routing IPv6 features available in Advanced Enterprise IOS Image only Routing Protocol Support RIPv1v2 OSPF EIGRP IP Cisco Discovery Protocol Cisco GMP IP Multicast PIM v1 PIMv2 Protocol Independent Multicast Sparse Mode PIM SM IGMPv1v2 IP Policy Routing IP Multicast Load Splitting Point To Point Protocol PPP Frame Relay X 25 XOT ...

Page 33: ...fication Pending on Cisco 5915 Router Card building on Legacy Cisco 3200 EAL3 Certification QoS Quality of Service QoS Classification Prioritization of Data guaranteeing determinism for mission critical data Generic Traffic Shaping Class Based Ethernet Matching Mobile Access Routing 802 1p Class of Service Committed Access Rate Flow Based WRED Low Latency Priority Weighted Fair Queuing Dial Backup...

Page 34: ...culated per MIL HDBK 217F Environment Hours at 25C Hours at 40C Ground Benign 273 821 207 633 Ground Mobile 21 283 16 038 Airborne Inhabit Fighter 19 951 16 047 Airborne Un Inhabited Fighter 7 980 6 419 Airborne Rotary Wing 9 363 7 267 Status Indication LED Indicators for power PWR and link status LNK Power 28 VDC nominal input voltage input range 9 36 VDC Operates down to 6v for short durations P...

Page 35: ...63 H x 6 75 D x 6 25 W 11 81cm H x 17 15cm D x 15 88cm W D 8 25 including connectors mounting tabs Figure 11 Front Panel Dimensions Physical Weight 6 6 lbs 3 kg Installation base flange mount or side boss mount 90 rotated orientation Connectors MIL DTL 38999 Series III Cooling passive natural convection no moving parts Ingress protection dust and water proof similar to IP67 Enclosure Finish corros...

Page 36: ...ggravated Sealing Water Immersion 1 Meter 30 Minutes per IP67 and MIL STD 810G Method 512 5 Procedure I Blowing Sand and Dust per MIL STD 810G Method 510 5 DO 160G Section 12 Cat S sealed enclosure IP67 No Dust Ingress Altitude Operational Altitude Up to 50 000 feet 15240 meters MIL STD 810G Method 500 DO 160G Storage Altitude Up to 60 000 feet 18 288 meters MIL STD 810G Method 500 DO 160G EMI EMC...

Page 37: ...xtended Service Contract that also includes an extension of the standard hardware warranty period In either case you need to provide the CSN Cisco Serial Number from the 5915 in order to obtain coverage Issue the show version command The CSN is returned as the Processor Board ID Returning for Service Before returning any Parvus product please fill out a Return Material Authorization RMA request fo...

Page 38: ...efense Solutions Division Curtiss Wright 3222 S Washington St Salt Lake City Utah USA 84115 801 483 1533 FAX 801 483 1523 Website www curtisswrightds com parvus Sales 1 800 483 3152 or 801 483 1533 slp_sales curtisswright com Product Technical Support 1 801 433 6322 slp_tsupport curtisswright com Customer Feedback slp_feedback curtisswright com ...

Page 39: ...ctive 05 Feb 19 Page 39 of 39 Parvus back cover 8 5 x 11 picture inserted in front of text DO NOT DELETE THE COMMENTS OR THIS PAGE These comments are only visible in Normal view The picture hides these comments when you print the manual or view it in Print Layout or Print Preview ...

Reviews: